Construction Work For Buildings Relating To Leisure, Sports, Culture, Lodging And Restaurants – Design, Execution Of Works And Technical Assistance From The Designer For The Objective Construction Of Recreational Infrastructure. Design, Execution Of Works And Technical Assistance From The Designer For The Construction Of Recreational Infrastructure Objective The Investment That Is The Subject Of This Documentation Consists Of The Following: A - Construction Of The Central Stand; B - Construction Of Annexes - Sanitary Groups; C - Building A Fitness Room - Recovery; D – Construction Of Individual Stands; E - Development Of Soccer Fields And Athletics Tracks; F – General Exterior Landscaping And Fencing. The Functions Proposed By The Design Theme Are In Accordance With National And European Standards. Within The Marketing Department, The Formation Of A Zoning Was Pursued, So That The Seats In The Stands Are Constituted By Sub-Zones, According To Categories: Category 1 (Approx. 1,585 Seats), Category 2 (Approx. 405 Seats) And Central (Approx. 110 Seats) ). The Estimated Total Value Is 39,365,087.90 Lei Without Vat, Composed Of: I. The Value Of Design And Technical Assistance Services (Conf. Dg, Ch. 3.2, Ch. 3.5.4., Ch. 3.5.6., Ch. 3.8.1, Ch. 3.1.1): Ch. 3 – Expenses For Design And Technical Assistance: 967,785.00 Lei; Subchapter 3.1.1 – Field Studies: 74,445.00 Lei; Subchapter 3.2 – Supporting Documentation And Expenses For Obtaining Approvals, Agreements And Authorizations: 49,630.00 Lei; Subchapter 3.5.4 – Technical Documentation Necessary To Obtain Approvals / Agreements / Authorizations: 74,445.00 Lei; Subchapter 3.5.6 – Technical Project And Execution Details: 620,375.00 Lei; Subchapter 3.8.1 – Technical Assistance From The Designer: 148,890.00 Lei; Ii. The Value Of Construction Works (Conf. Dg, Ch. 1.2, Ch. 2.1., Ch. 4.1, Ch. 4.2., Ch. 4.3. Ch. 5.1) : Ch. 1 – Expenses For Obtaining And Arranging The Land: 2,481,500.00 Lei; Head. 2 – Expenses For Providing The Utilities Necessary For The Investment Objective: 506,226.00 Lei; Head. 4 – Expenditures For The Basic Investment: 34,924,191.00 Lei, Consisting Of: Subchapter 4.1 – Construction And Installations: 32,359,060.00 Lei; Subchapter 4.2 – Installation Of Machinery, Technological And Functional Equipment: 456,596.00 Lei; Subchapter 4.3 – Machinery, Technological And Functional Equipment That Requires Assembly: 2,108,535.00 Lei; Head. 5 – Other Expenses – 485,385.90 Lei, Of Which: Subchapter 5.1 – Site Organization: 485,385.90 Lei.
|