Tender For The Work Of 11 Kv Independent Feeder For Issuing 250 Kva New Connection In Village Patsal (Fathepursikri Part-I Cwr) Under Jal Jeevan Mission On Semi Turnkey Basis In Full Deposit Scheme Under The Area Of Edd-Iv Kiraoli. - 1 Part-A (Supply of Material)G.I. Pipe 6 Dia 2 M.S. Top Channel 125x65x3200 mm 3 M.S. Dropper Channel 100x50x2600mm 4 Number Plate 5 Barbed Wire 6 Aluminium Tape 7 Clamp with Nut & Bolt 8 F-Bracket 9 Red oxide & Al. Paint 10 Guarding Angle 65x65x6x3500mm 11 Guarding Angle Clamp 12 11 KV Pilfer Proof Metering Cubical 13 Stone Pad 14 Stay Set 15 Part-B (Erection work)Cartiage of11 KV XLPE 3x120 sqmmfrom store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) 16 Cartiage of 11 KVO/G VCB STEL MAKE 400/200/5Afrom store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) 17 Cartiage ofST Pole 11 Mtr from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) 18 Cartiage ofST Pole 13 Mtr from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) 19 Cartiage of11 KV CT-PT Metering Pole Mounting Unit from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) 20 Cartiage ofCable Jointing Kit, I/D and O/D3x120 sqmm cable Jointing Kit from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) 21 Cartiage of Line Material from Store Center Agra to work of site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.)Line material viz. Aerial bunch conductor/Weasal conductor/Dog/ Rabbit, G.I. earth wire, cross arm, angle, channel, insulators,clamps, Dist. Box, and other line material, if required in Estimate/Package. 22 Erection and grouting in 1:2:4 ratio (cement, sand and bricks balast) on Single Pole 11 Mtr. long ST poles including fixing ofall accessories for 11 KV line as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. 23 Erection and grouting in 1:2:4 ratio (cement, sand and bricks balast) on Double Pole 11 Mtr. long ST poles including fixing ofall accessories for 11 KV line as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. 24 Erection and grouting in 1:2:4 ratio (cement, sand and bricks balast) on Tri Pole 11 Mtr. long ST poles including fixing ofall accessories for 11 KV line as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. 25 Erection and grouting in 1:2:4 ratio (cement, sand and bricks balast) on Single Pole 13 Mtr. long ST poles including fixing ofall accessories for 11 KV line as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. 26 Laying sagging stringing and binding and jumperingofACSRDog Conductor at 11 KV/LT lineas per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work. 27 Laying sagging stringing and binding and jumperingofACSRWeasel Conductor at 11 KV/LT lineas per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work. 28 Erection and grouting stay of ratio 1:2:4 (cement, sand and bricks balast) as per RESPO norms including the costof arrangement of labour, T&P, carrier etc. required for proper completion of work. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost. 29 Fixing of earthing rod as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. 30 Fixing ofP.G. Clamps as per RESPO norms 31 Fixing of Danger Boards With clmap (shock Proof, Rust Proofs) on Poles as per RESPO norms. 32 Fixing of Number plates on Poles as per RESPO norms. 33 Filling of 11KV 3x120 sqmm Indoor/Outdoor Jointing Kit and making connection as per direction of supervising engineer. 34 Installation & Commissoning of 11 KV O/G VCB STEL Make 400/200/5A proper alignment and direction and jointing of earthing strips with help of gas welding and making cable connection including shifting dragging with all other associated works. 35 Water Level Earthing of 11 KV VCB as per RESPO Norms or Direction by supervising Engineer. 36 Fixing of Stone Pad as per RESPO Manual Labour, T &P and carriageetcand other associated works to complete the work. All work shall be born by the contractor at his own cost. 37 Laying of 11 KV 3x120 sqmm XLPE cable (Double Circuit i.e (50+70)x2=240 Mtr)by drill machine/H.D.D. Machine including the cost of arrangment of labour, T&P & Drill mchine/H.D.D. machine at a depth of 1.0 mtr. Below the ground level. 38 Laying of 11 KV 3x120 sqmm XLPE cable in trenchwith making loop (at a distance of approx. 4 mtr.) laying of bricks (18 nos. in one meter), filling of sand in trench then laying earth and its levelling and rammuring etc., complete work as RESPO norms. 39 Hoisting and Stringing 11 KV 3x120 sqmm XLPE overhead cable with 6 Dia G.I. Pipe includes unroling cutting / megaring & sealing both ends as per Norms. 40 Installation of D.O. Fuse set as per Site requirment and RESPO Norms. 41 Fixing of 11 KV CT-PT Metering Pole Mounting Unit as per RESPO Manual Labour, T &P and carriageetcand other associated works to complete the work. All work shall be born by the contractor at his own cost. 42 Fixing of TPMO on Double Poles as per Site requirment and RESPO Norms. 43 Guarding of HT/LT line by laying, stringing, sagging and binding of 2 Nos. parallel GI wire 6 SWG after providing, fabrication and fixing of guarding angle and fabrication and fixing of X-guards (Tillis) of GI wire at distance of 3 Mtr. including the cost of arrangement of abour, T&P etc.required for proper completion of work. 44 Painting of STP 11 Mtr. (115 Nos.Poles) with single coat of red oxide primer and Double coat of Aluminium paint. as per RESPO norms. All required material including arrangment of labour shall be born by contractor at his own cost. 45 Installation of 11 KV Pilfer Proof Metering Cubical & Making connection as per RESPO Norms or Direction by supervising Engineer.
|