Tender For The Work Of 11 Kv Independent Feeder For Issuing 200 Kva New Connection In Village Bakanda Khas Of 33/11 Kv S/S Ipds Kirawali Under Jal Jeevan Mission On Semi Turnkey Basis In Full Deposit Scheme Under The Area Of ??Electricity Distribution Division-Iv Kiraoli. ; 1 Part-A (Supply of Material)G.I. Pipe 6 Dia 2 M.S. Top Channel 125x65x3200 mm 3 M.S. Dropper Channel 100x50x2600mm 4 Number Plate 5 Barbed Wire 6 Aluminium Tape 7 Clamp with Nut & Bolt 8 F-Bracket 9 H.D.P.E. Pipe 10 Earth Wire clamp with Nut & Bolt 11 Red oxide & Al. Paint 12 Guarding Angle 65x65x6x3500mm 13 11 KV Pilfer Proof Metering Cubical 14 Stone Pad 15 Bolt Nut & Washer 16 11 KV Ligthening Arrestor (Start and End) 17 Stay Set 18 Part-B (Erection work)Cartiage of11 KV XLPE 3x185 sqmm & 11 KV XLPE 3x70sqmmfrom store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) 19 Cartiage of 11 KV VCB BHEL MAKE 400/200/5A 800 Amp. from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) 20 Cartiage ofST Pole 11 Mtr from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) 21 Cartiage ofST Pole 13 Mtr from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) 22 Cartiage ofPCC Pole 8.5 Mtr.from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) 23 Cartiage of11 KV CT-PT Metering Pole Mounting Unit from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) 24 Cartiage of11 KV 3x185 sqmm, Cable Outdoor Jointing Kit, I/D and O/D cable Jointing Kit 3x70 sqmm from store center agra to work of site through Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) 25 Cartiage of Line Material from Store Center Agra to work of site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work..(Distance 00-70Kms.)Line material viz. Aerial bunch conductor/Weasal conductor/Dog/ Rabbit, G.I. earth wire, cross arm, angle, channel, insulators,clamps, Dist. Box, and other line material, if required in Estimate/Package. 26 Erection and grouting in 1:2:4 ratio (cement, sand and bricks balast) on Single Pole 11 Mtr. long ST poles including fixing ofall accessories for 11 KV line as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. 27 Erection and grouting in 1:2:4 ratio (cement, sand and bricks balast) on Single Pole 13 Mtr. long ST poles including fixing ofall accessories for 11 KV line as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. 28 Erection and grouting in 1:2:4 ratio (cement, sand and bricks balast) on Double Pole 13 Mtr. long ST poles including fixing ofall accessories for 11 KV line as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. 29 Erection and grouting in 1:2:4 ratio (cement, sand and bricks balast) on Four Pole 13 Mtr. long ST poles including fixing ofall accessories for 11 KV line as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. 30 Erection and grouting in 1:2:4 ratio (cement, sand and bricks balast) on Single Pole 8.5 Mtr. Long PCC including fixing ofall accessories for 11 KV line as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. 31 Erection and grouting in 1:2:4 ratio (cement, sand and bricks balast) on Double Pole 8.5 Mtr. Long PCC including fixing ofall accessories for 11 KV line as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost. 32 Laying sagging stringing and binding and jumperingofACSR Weasel Conductor at 11 KV/LT lineas per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work. 33 Laying sagging stringing and binding and jumperingofACSRDog Conductor at 11 KV/LT lineas per RESPO norms It includes the cost of labour, T & P carrier etc required for proper completion of work. 34 Erection and grouting stay of ratio 1:2:4 (cement, sand and bricks balast) as per RESPO norms including the costof arrangement of labour, T&P, carrier etc. required for proper completion of work. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost. 35 Fixing of earthing rod as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. 36 Fixing ofP.G. Clamps as per RESPO norms 37 Fixing of Danger Boards With clmap with Nut & Bolt(shock Proof, Rust Proofs) on Poles as per RESPO norms. 38 Fixing of Number plates on Poles as per RESPO norms. 39 Filling of 11KV 3x70/185 sqmm Indoor/Outdoor Jointing Kit and making connection as per direction of supervising engineer. 40 Installation & Commissoning of 11 KV VCB BHEL MAKE 400/200/5A 800 Ampproper alignment and direction and jointing of earthing strips with help of gas welding and making cable connection including shifting dragging with all other associated works. 41 Chemical Earthing of 11 KV VCB as per RESPO Norms or Direction by supervising Engineer. 42 Fixing of Stone Pad as per RESPO Manual Labour, T &P and carriageetcand other associated works to complete the work. All work shall be born by the contractor at his own cost. 43 Fixing of Bolt Nut & Washer of various sizes as per RESPO Manual Labour, T &P and carriageetcand other associated works to complete the work. All work shall be born by the contractor at his own cost. 44 Laying of 11 KV 3x185 sqmm XLPE cable (Double Circuit i.e 300x2=600 Mtr)Through H.D.P.E.pipedue to Railway crossing by drill machine/H.D.D. Machine including the cost of arrangment of labour, T&P & Drill mchine/H.D.D. machine at a depth of 1.0 mtr. Below the ground level. 45 Road restoration due to pucca road crossing by drill machine/H.D.D. Machine for Laying of 11 KV 3x185 sqmm XLPE(Double Circuit i.e 800x2=1600 Mtr) cable Through H.D.P.E.pipe including the cost of arrangment of labour, T&P & Drill mchine/H.D.D. machine as per site requirment. 46 Laying of 11 KV 3x185 sqmm XLPE cable in trenchwith making loop (at a distance of approx. 4 mtr.) laying of bricks (18 nos. in one meter), filling of sand in trench then laying earth and its levelling and rammuring etc., complete work as RESPO norms. 47 Hoisting and Stringing 11 KV 3x185 sqmm XLPE overhead cable with 6 Dia G.I. Pipe includes unroling cutting / megaring & sealing both ends as per Norms. 48 Laying of 11 KV 3x70 sqmm XLPE overhead cable complete work as per RESPO Norms. 49 INSTALLATION OF 11 KV LIGHTENING ARRESTORS :-Assembling and installation / mounting of 3 nos. lightening arrestors on the L.A structure / Terminal Gentry complete with making earth connection (seprate) and line connection . The work includes providing & fabrication of 3 Nos. M.S Plates of size 300×450mm, 10 mm thick for placing lightening arrestors. 50 Guarding of HT/LT line by laying, stringing, sagging and binding of 2 Nos. parallel GI wire 6 SWG after providing, fabrication and fixing of guarding angle and fabrication and fixing of X-guards (Tillis) of GI wire at distance of 3 Mtr. including the cost of arrangement of abour, T&P etc.required for proper completion of work. 51 Installation of 11 KV Pilfer Proof Metering Cubical & Making connection as per RESPO Norms or Direction by supervising Engineer.
|