Auction Sale Of Scrap Condemned And Unserviceable Released/Abandoned Structus Building At Station -Utd (Quarter No T/17 Type 1 Unit 1, Quarter No T/18 & 19 Type 1 Unit 4).Station- Kbrb (Quarter No T/25 Type 1 Unit 2, Quarter No E/19,20,21&22 Type 1 Unit 8). Station ? Nd (Quarter No E/102 Type 1 Unit 2, Lc-277 Nd-Gte( Cabin At Lc-277,Service Bld. Unit 1) Station- Gte (Quarter No T/24 Type 2 Unit 1, Quarter No T/25 Type 2 Unit 2).Lc 283 Gte ( Cabin At Lc 283, Service Bld. Unit 1) Gte- Mhd (Quarter At Lc 286 Type 1 Unit 2) Station- Mhd ( Quarter No E/47 Type 1 Unit 2) Lc 296 Kanj ( Cabin At Lc 296, Service Bld. Unit 1).Total Unit- 27.Total Material [ Brick Works 281.66 Cum, Precast/Rcc Slab 358.6 Cum, Wooden & Ms Door Frame In Off Size 49 Nos, Window, Ms Window & Ventilator Frame In Off Size 40 Nos, Wooden Rafter/Beam/ Jaffari 44 Cum, Pvc Doors 21 Nos, Ac Sheet 173.9 Sqm. Rail 30 Lbs/90 R/69 Lbs/82 Lbs & Ms Item (Daniya, Tie Bar, Tie Bar Fencing Flat, 12 Mm Rod, Rail Daniya, Angles, Sheet, Fencing, Parline Angle, Flat, Ms Pipe, C/Yard Door Plate & Flat, Wind Tie Flat, Ismc, Ms Sheet, Stair Case, Isa, Flight Runner Etc.) Total Weight: 10195.66 Kg.].Delivery- As A Lot. Custodian: Sse Works Nd. Note No. [1] Dismantling Up To Ground Level Only. Below Ground Level Is Not Permitted. [2] During Dismantling Purchaser Should Take Necessary Measures To Avoid Any Mishaps. [3] Purchaser Should Insure To Keep A Safety Banner Arround The Work Spot. [4] After Removing /Clearing The Rcc/Bricks Masonary Rubbish From Spots The Delivery Of Wood/Iron Material Will Be Affected. [5] After Delivery The Land Should Be Clear Of All Debris. [6] Free Delivery Period 50 Days. The Lot Details Are As Per Jvr And Measurement Sheet
|