Road Construction Works – Renovation Of Schützenstrasse, Oststrasse And Bischof-Bornewasser Strasse. Take Up 2270 M2 Of Paving Fastening Take Up 390 M2 Of Natural Stone Paving Take Up 245 M2 Of Asphalt Paving 125 M3 Of Soil Excavation Cable Trench 680 M Secure Cable Trench 95 M3 Of Sand Supply/Install 1495 M3 Of Earthworks Hb Utilize Loose Rock 400 M3 Of Earthworks Hb Loose Rock. Deepening, Utilize 210 M3 Of Additional Soil Loosen, Solid Rock 1050 M3 Of Soil To Use Laga 1.2 445 M3 Of Soil To Use Laga Z2 445 M3 Of Soil To Dispose Of Dk Ii 610 M3 Of Frost Protection Layer Create 725 M3 Of Gravel Base Layer Create 2810 M2 Of Subgrade Create 2721 M2 Of Concrete Paving 2394 M2 Of Runners And Gutters Produce 1830 M Of Pavement Cutting