Construction Work – Design And Execution Of Works For The Task Titled: Revitalization Of Railway Line No. 108 On The Jasło - Nowy Zagórz Section As Part Of The Project Entitled Revitalization Of Railway Line No. 108 On The Jasło - Nowy Zagórz Section Along With The Construction Of The Jedlicze - Szebnie Railway Connection. The Subject Of The Order Is The Design And Execution Of Works For The Task Titled: Revitalization Of Railway Line No. 108 On The Jasło - Nowy Zagórz Section As Part Of The Project Entitled Revitalization Of Railway Line No. 108 On The Jasło - Nowy Zagórz Section Together With The Construction Of The Jedlicze - Szebnie Railway Connector The Basic Scope Includes The Design And Execution Of Construction Works For Railway Line No. 108 On The Jasło - Nowy Zagórz Section, From Km 47,000 To Km 69,242, In The Scope Track System With Turnouts And Drainage, Railway Subgrade, Geology, Geotechnics, Engineering Structures, Railway And Road Crossings And Crossings, Roadways, Passenger Service Facilities And Small Architecture, Facilities And Buildings For Railway Traffic, Railway Traffic Control Devices, Electrical Power Engineering For 1 Kv, Lpn Power Engineering, Telecommunications And Telecommunications, Sanitary Industry, Environmental Protection, Removal Of Conflicts With External And Internal Networks, Demolition And Liquidation Of Infrastructure, Cutting Down Trees And Bushes. The Description Of Options No. 1-4 Can Be Found In Section 5.1.1 Purpose, In The Field: Option Description. The Entire Subject Of The Order Includes The Preparation Of The Following Elements: 1) Design Documentation, Including: A) Updating Of Construction Designs In The Following Sectors: Railway Traffic Control, Telecommunications, Power Engineering And Cubature Facilities, B) Development Of An Executive Design, C) Preparation Of As-Built Documentation, Including As-Built Geodetic Documentation, 2) And Works In The Scope Of: A) Works Of The Track, Subgrade And Platform Industry Together With Small Architecture, B) Works Of The Drainage Industry, C) Works Of The Construction Industry Related To Railway Traffic, Including Demolitions, D) Works Of The Engineering Industry, E) Works Of The Industry Sanitary (Internal Sanitary Networks [Including Water And Sewage, Gas, Air Conditioning, Ventilation, Heating] And External Networks), F) Works In The Road Industry, G) Works In The Traction Network Industry With Power Supply And Control Of Traction Network Disconnectors, H) Works Non-Traction Power Engineering Industry, I) Works In The Railway Traffic Control Industry, J) Works In The Telecommunications Industry, K) Works In The Non-Traction Lines Industry, L) Works Related To The Removal Of Conflicting Networks, M) Works In The Environmental Protection Industry, Including Works Related To Cutting Down Trees And Shrubs, N) Any Other Necessary To Carry Out The Task In Accordance With Applicable Regulations, 3) Carrying Out The Conformity Assessment Process Of Structural Subsystems Within The Scope Of The Order At Each Stage (Design, Construction And Final Tests Of The Subsystem) And Submitting The Appropriate Ec Verification Declarations And Ec Verification Certificates For Subsystems. A Detailed Description Of The Subject Of The Order Is Presented In The Functional And Utility Program (Ffu) Constituting Volume Iii Of The Swz. The Project Is Applying For Co-Financing By The European Union From The Instrument European Funds For Eastern Poland. Information Supplementing Section 5.1.3 Estimated Validity Period: Order Implementation Period: 52 Months From The Date Of Conclusion Of The Contract
|