Repair To Bridge Pier That Was Damaged From Recent Flood Events:•Install Sediment And Erosion Control Measures Prior To Site Establishment.•Construct Fisheries Approved Access To Pier Including Any Other Required Measures According To The Fisheries Approved Cemp.•Clear Vegetation Surrounding Pier.•Fill Void With Rock (As Large As Can Be Practically Installed) As Per Engineer Drawings.•Install Rock Protection Around Pier Approximately 14M Long X 3M Wide X 2M Deep As Per Engineer Drawings.•Remove Temporary Access.•Dispose Of Material At Registered Disposal Site.•Apply Hydromulch Or Approved Equivalent To Disturbed Areas, Or Other Forms Of Rehabilitation.•Remove Sediment And Erosion Control Measures Post Site Demobilisation And Removal Of Machinery And Equipment From Site.
Contact Information
Address
Zingel PlBega, New South Wales 2550Australia
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 88733865
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.