The City Of Löhne Would Like To Carry Out Investigations On A Former Sports Field In The Löhne -Bahnhof Twelsiek Industrial Area District. In Order To Carry Out These Investigations, It Is Necessary To First Remove The Existing Top Layer Of Ash, Slag And Gravel. The Area Is Approximately 9,000 Square Meters And Must Be Removed In A Layer Thickness Of Between Approx. 10 Cm Up To A Maximum Of 1.00 M In Small Areas. For The Area To Be Removed, The Unbound Soil Was Examined In Advance To Determine Whether It Could Be Recycled Or Disposed Of. A Corresponding Report Is Available. The Soil Complies With The Requirements Of Dk 0 And Is To Be Disposed Of At The Reesberg Felix-Wankel Straße 15 Landfill In 32278 Kirchlengern. A Corresponding Accompanying Document Procedure Must Be Carried Out. In This Context, It Is Important To Ensure That The Companies To Be Used Have Appropriate Certification And That The Vehicles (Trucks) Are Marked With The Sign -A- (For Waste). The Total Amount Of Excavation Is Approx. 6800 Tonnes. In Order To Carry Out The Work And The Associated Removal Of The Excavated Material, It Is Necessary To Create A Temporary Construction Road, Which Must Be Dismantled After The Work Has Been Completed. The Location Of The Construction Road Must Be Agreed With The Client Before Work Begins. The Effort Required For Coordination Will Not Be Reimbursed Separately And Must Be Taken Into Account. The Work Must Begin Immediately After The Order Has Been Awarded!
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 88732851
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.