Engineering Design Services – Extension Kita Awo Lot 4 -Technical Equipment. [1]. According To The Detailed Provisions Of The Contracts, The Commissioned Scope Of Services Is The Provision Of Planning Services In Service Phases 1 To 9, Which Are Assigned To The Property Planning Building Service Profile. Additional Services Commissioned Include Building Acoustics In Accordance With Section 1.2.4 Of Appendix 1 To The Hoai 2021 And Room Acoustics In Accordance With Section 1.2.5 Of Appendix 1 Hoai. At The Same Time, The Planning Services Relating To The Property Planning Of Buildings, Open Space Planning And Structural Planning Are Awarded As Separate Lots. The Assignment Is Carried Out In Service Levels In The Sense Of An Extension Of The Contract In Accordance With § 315 Bgb By The Client As Follows: Tga: (A.) 1St Level: Lh 1-4, (B.) 2Nd Level: Lp 5, 6, ( C.) 3Rd Level: Lp 7-9. [2]. The Client Sets The Following Time Requirements For The Construction Process: (A). The Execution Of The Contract Should Begin Immediately After The Completion Of The Award Procedure. The Contractor Is Expected To Complete Phase 4 In October 2025. (B). Execution Of The Necessary Construction Work Should Begin In March 2026 (Start Of Construction) At The Latest. (C). The Measure Should Be Completed By The End Of 2027 At The Latest (End Of Construction). [3]. Short Description: The Existing Daycare Center Run By Arbeiterwohlfahrt Is To Be Expanded To Cover Daycare Places And The Implementation Of Section 14 (1) Kitag. This Measure Is Intended To Create Two Additional Groups That Offer Additional Space For 35 Children. It Should Be Ensured That Every Child Can Be Offered Lunch During Lunchtime Care. In Addition, The Daycare Centers Space Requirements Should Be Adapted To Todays Recommendations And The Building Should Meet The Requirements Of The Recognized General Rules Of Technology. The Existing Building Must Also Be Taken Into Account And Must Comply With The Relevant Dguv Regulations And Energy Standards. There Is No Development Plan For The Property. Since The Environment Is Very Heterogeneous With Buildings Up To Five Full Floors, An Extension Should Not Be A Problem. However, This Must Be Clarified As Part Of A Preliminary Building Inquiry. The Tree Population Must Be Taken Into Account During The Measure, Which Is Why A Mapping Report Is Created By The Client And Can Be Taken Into Account In Service Phase 2. A Feasibility Study Was Carried Out In Advance To Test The Feasibility Of The Expansion. This Suggests A Few Concepts, Which Is Why Variant 2 Of The Options Given Was Agreed Upon In Advance. The Variant Must Therefore Be Taken Into Account In The Planning And Can Be Optimized And Adapted If Necessary. It Is Important To Align The Planning With This Structure, To Emphasize The Special Nature Of The Use Architecturally And To Focus On Long-Term And Flexible Use Of The Building With Sustainable Building Concepts. The Climate Protection Concept Of The City Of Neuwied Must Be Observed. Furthermore, Should
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 88691670
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.