Electrical Installation Work – Development Of Tirighina Photovoltaic Park Code Smis 315080. Development Of Tirighina Photovoltaic Park Code Smis 315080 The Object Of The Contract Is The Construction Of A Photovoltaic Power Plant (Turnkey) And Connection To The National Energy System, With An Installed Capacity Of At Least 4Mw, By The Municipality Of Galati, Within The Radius Of The Municipality Of Galati, Barbosi-Sidex Area, Lot 1, Land Card No. 139774. If, As A Result Of The Design, A Saving Of Space Results, The Contracting Authority Reserves The Right To Request An Increase In The Installed Capacity Of The Photovoltaic Park, Within The Limit Of 15% Of The Contract Value, And The Tenderer Has The Obligation To Undertake All The Necessary Legal Steps For Carrying Out The Request Of The Contracting Authority. If, As A Result Of The Design, A Surface Economy Results, The Contracting Authority Reserves The Right To Request An Increase In The Installed Capacity Of The Photovoltaic Park, Within The Limit Of 15% Of The Contract Value, And The Tenderer Is Obliged To Take All The Necessary Legal Steps To Lead To Fulfillment Of The Request Of The Contracting Authority. The Term Of The Contract: 15 Months, Of Which 3 Months Design And 12 Months Execution, But No Later Than 30.09.2026.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 88689422
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.