Metalworking – Nuremberg Nord Hospital - House 47 Plumbing And Heating Renovation - Metal Construction And Locksmith Work. The Heating And Plumbing Renovation Is Carried Out In Several Construction Phases During Ongoing Operations. For This Purpose, The Rooms In The Construction Phases To Be Renovated Are Cleared Either Completely Or In Sections, Depending On Requirements. A New Heating Center With A Connection To The District Heating Is Being Built In The Unused Attic. A New Pump Hot Water Distribution Network Will Be Installed Throughout The Building And The Existing Radiators Will Be Replaced. The Sanitary Cores And Kitchenettes Throughout The Building Will Be Renovated And The Cold And Waste Water Network Will Be Replaced. Locksmith Work On The Roof Center: • Support Grid 1, Ipe 140, 5 Kn/M², Approx. 7.69X4.41 M, Hot-Dip Galvanized, Approx. 850 Kg • Support Grid 2, Ipe 140, 5 Kn/M², Approx. 8.39X3.97 M , Hot-Dip Galvanized, Approx. 800 Kg • Support Beam U=200, L=5.435, 1 Piece • Stainless Steel Tub 1, V4a, With Vertical Drain, 6.83X2.42X0.06 M, 1 Piece • Stainless Steel Tub 2, V4a, With Vertical Drain, 7.455X2.42X0.06 M, 1 Piece • Grating, Support Grid, Approx. 70 M² • Assembly Grid, Ipe 120, 5 Kn/M², 0.90X1.40 M Hot-Dip Galvanized, 4 Pieces • Grating, Assembly Grid, 0 ,50X1.40 M, 4 Pcs. Locksmith Work Doors: • Sheet Steel Door T30-Rs 1-Leaf, Uz, 4 Pcs. • Steel Sheet Door T90-Rs 1-Leaf, Uz, 5 Pcs.
|