Restoration Works Of Naini Dy And Demarcation Of Canal Land From Km 0.000 To Km 19.910 - Dismantling brick work cement mortar including stacking of materials as directed by engineer in-charge within a distance of 60 m per direction of Engineer-in-Charge. 2 Earth work in Excavation of foundation in ordinary soil/sandy loam, clay or sand including lift up to 1.5 meter and lead up to 30 meter including filling, watering, ramming, of excavated earth into the trenches or up to the space and sides of the foundation trenches or into charge up to a distance of 30 meter from the foundation trenches per direction of Engineer-in-Charge. 3 Laying C.C. M-10 (1:3:6) one part of cement, three part of coarse sand F.M.>2.00 & six part of stone ballast (size 20 mm to 40 mm) including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge. 4 1st Class Brick masonry in 1:3 CM (one part of cement and three Part of coarse sand F.M. >2.00)including cost ofmaterial, labour T&P etc. for proper completion of work as per direction of Engineer-in-Charge. 5 Centering and shuttering of R.C.C. work including cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge. 6 Supplying & fixing 20mm thick joint filler board including cost ofmaterial, labour T&P etc. for proper completion of work as per direction of Engineer-in-Charge. 7 S/L 3mm thick multi-plast poly Plus Tar paper including cost ofmaterial, labour T&P etc. for proper completion of work as per direction of Engineer-in-Charge. 8 Reinforcement of RCC work including cost of steel, cutting, bending, placing in position & binding with 16 gauge binding wire including cost oflabour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge. 9 Laying R.C.C. Slab M-20 (1:1.5:3) A-20, M-20 With cement, crushed grit size 4.75 mm to 20mm well graded including cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge. 10 Laying C.C. copping M-20 (1:1.5:3) A-20, M-20 With cement, crushed grit size 4.75 mm to 20mm well graded including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge. 11 Cement pointing 1:2 C.M.on Brick Masonary including cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge. 12 E/W in filling ininner section of both banks, Daula, Service road and Aproaches of Naini Dy including proper compaction in layers and dressing with all lead, lift, T&P in all type of soil as per directed by site-in-charge. 13 Earth work in Correcting internal section of Naini Dy.including proper compaction in layers and dressing with all lead, lift, T&P in all type of soil as per directed by Engineer-in-Charge. 14 Correcting internal section of Naini Dy. with earth filled new EC bagsincludingstitching with cost of sutli, bags and filling materials with placing in position at siteas per directed by Engineer-in-Charge. 15 E/W in cutting ininner section of tail gul of Naini Dy. including properdressing with all lead, lift, T&P in all type of soil as per directed by Engineer-in-Charge. 16 E/W Dismentaling of diversion including all lead & lift, cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge. 17 Colour washing of two coat of parapet including cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge. 18 Fixing wheel guard stone including cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.. 19 Providing and Laying LDPE Film on footing box, including cost of all material, labour, T&P etc. required for proper completion of work as direction of Engineer-in-charge . 20 Shuttering For BoundrayPillar work., including cost of all material, labour, T&P etc. required for proper completion of work as direction of Engineer-in-charge . 21 M-15 (1:2:4) PCC Foundation Concrete For BoundrayPillar work., including cost of all material, labour, T&P etc. required for proper completion of work as direction of Engineer-in-charge . 22 Fixing of RCC Precast BoundrayPillar work., including cost of all material, labour, T&P etc. required for proper completion of work as direction of Engineer-in-charge . 23 Paintingof RCC Precast BoundrayPillarincluding cost of all material , labour , T&P etc. required for proper completion of work as direction of Engineer-in-charge 24 Writing letter onRCC Precast BoundrayPillar above 50mm but below 80mmincluding cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge. 25 Dry brick on edge soling , including all cost of material, labour and T&P etc. required for proper completion of the work as direction of Engineer-in-charge. 26 Providing and fixing of 150 mm dia HDPE rigid pressure pipe 6 kg/m2 including cost of all material and labourT&P etc per direction of Engineer-in-Charge. 27 Preparation of Sub-grade for Lining excluding cost of earth work. 28 Supply and laying 100 mm thick local sand below in foundationC.C. including cost of all materials labour T&P etc per direction of Engineer-in-Charge. 29 Cut stone Masonary with 1:3 C.M. including cost of material labour T&P etc per direction of Engineer-in-Charge per direction of Engineer-in-Charge. 30 20 mm deep struck cement pointing on stone masonary with 1:2 C. M including cost of all materials, labours T&P etc per direction of Engineer-in-Charge.
|