Tender For 11Kv Badalpur Underground Feeder Single Circuit Convert To Double Ckt. Hence Laying Of Single Circuit Parellel With Existing Single Circuit. Provision Of Double Circuit Cable Under Bridge By 3X185sqmm Xlpe For Making Spare For 11Kv Roopwas- 11KVBadalpur underground Feeder Single circuit convert to double Ckt. Hence Laying of Single Circuit parellel with existing single circuit. 2 Safe carriage of following stock material, from any of the Store Center of PVVNL to work siteincluding Loading from Store and safe unloading at site for Item No. 3 to 12 3 ST Pole 11Mtr long 4 Stone Pad 5 Top Channel 6 Dropper Channel 7 11KV XLPE Cable 3x185sqmm 8 11KV O/D Termination Kit for 3x185sqmm XLPE Cable 9 11KV Straight Through for 3x185sqmm XLPE Cable 10 Pin Insulator with Pin 11 Stay Set Complete 12 Earthing complete 13 Errection of above Following material and Supply and errection of the DE-CENTRALISED material for completing the works as per RESPO. 14 The excavation of foundation pit in mix soil/normal soil/soft soil & hard rock as per site condition and its back filling and leveling etc. The size of the pit will be (750x450)mm and having depth of 1/6th of the full length of the support. Erection of support, complete with providing & fixing of all G.I.Clamps size of 75x10mm, 65x8mm, G.I.Nut bolt & washer, P.G.Clamp, Stone Pad, Al. Binding wire, E bracket 75x10mm, and other accessories as per drawing. The work includes carriage and handling of supports from sectional store to pit site as well as any fabrication work if required & fixing of cross bracing sets 4.3mtr long, from G.I.Angle 65x65x6mm. The work includes cutting holes and providing G.I.Bolt of 16x40mm size, in the middle of the cross bracing with 01No. spring washer of proper size as per drawing/ as per schedule.Double Pole Structures(a)ST 11MTR LONG 15 Grouting of supports in CC 1:3:6 (Cement, sand & 20mm stone grift). Grouting will be done in the block of size (450x450)mm x1/6th of full length of the support, upto ground level, 300mm plinth above the ground level with C.C. 1:3:6 (Cement, Course sand and Stone grift) with muffing as per RESPO. Work includes back filling and proper ramming.Single Pole and Double Pole(a)ST 11MTR LONG 16 FIXING OF PIN INSULATOR WITH PIN, COMPLETE WORK IN ALL RESPECT. 17 FIXING OF TOP CHANNEL AS PER SITE REQUIREMENT. 18 FIXING OF DROPPER CHANNEL AS PER SITE REQUIREMENT. 19 FIXING OF STONE PAD AS PER SITE REQUIREMENT. 20 Supply of 160mm OD PN-4-PE-80 Grade UV Stabilized HDPE Pipe.(PVVNL GTP APPROVED) 21 Drilling of dia 220 mm in two parallel bores for Double Curcuit by trenchless method by horizontal boring machine at a depth of 1.50 mtrs to 2.50 mtrs. (as requirement at site) below the ground level with complete work in all respect as per RESPO. 22 Laying ofHDPE Pipe PE-80, PN-4, DN-160mm dia by HDD trenchless method for 11KV, 3x185sq.mm XLPE cable as per site requirement. (PVVNL GTP APPROVED HDPE PIPE SHALL BE SUPPLIED WITH INSPECTION.) 23 Laying and commissiong of 11KV 3x185sqmm XLPE CableDouble Ckt. in HDPE Pipe dia after digging HDD trenchless methodboring including complete connections at both ends after providing and crimping of lugs of proper size for completion of work.as per site requirement. 24 Digging of pits of size 4 mtr x 4 mtr x 1.5 mtr for cable loop and making risers at double pole and re-filling of pits in proper manner with required material at kacha/pakka and hot mix road. (All Work and materialin the scope of contractor) 25 Laying of 11 KV 3X185 Sq.mm XLPE Cable in the air on cable Riser Double Pole, existing trench cable trench, nala x-ing & G.I.Pipe and making connection complete at both ends. 26 Preparation and Fixing of 11 KV Power Cable ends:Making and Fixing of 11 KV XLPE Heat shrinkable outdoor jointing kits suitable for 3x185sqmm XLPE Cable after duly plumbing and taping of cable, providing, fixing and crimping of proper size good quality lugs with complete connention in all respect. 27 Preparation and Fixing of 11 KV Power Cable ends:Making and Fixing of 11 KV XLPE Heat shrinkable stright throughsuitable for 3x185sqmm XLPE Cable after duly plumbing and taping of cable, providing, fixing and crimping of proper size good quality lugs with complete connention in all respect. 28 Driving of MSearth rod of size20x2500 mm in earth andjointing through G.I. wire of 6 SWG between support and earth electrode by providing proper size of bolts and nuts for pole earthing. Supply Erection, fixing, grouting of stay rod in cement, sand and brick ballastin ration 1:4:8 in Block 600*600*300 mm with binding & nuzzlingincluding providing & fixing of stay insulator complete in all respect with grouting. 29 Fixing, tightening & nozzling of stay set complete with wireand stay rod with the poles of required tension as per drawing, including providing & fixing of Stay Insulators of 11KV and Stay Clamps with Grouting of stay rods (20x1800)mm including all work of excavation, cement concrete in size (0.60x0.60x0.30)m in ratio 1:3:6 cement, sand, 20mm Stone grift) as per drg. Including back filling of soil and proper ramming etc. 30 Providing and Fixing of GI Pipe 6 Dia as per site requirement. 31 Providing and Fixing of Danger Board as per site requirement. 32 Providing and Fixing of Ms Holding Clamp as per site requirement. 33 Providing and Fixing of MS Nut Bolt as per site requirement. 34 Road Cutting and Road Restoration Charges for the above work. 35 Provision of Double Circuit Cable under Bridge by 3x185sqmm XLPE for making spare for 11KV Roopwas, Old Railway and New Railway Feeder emanting from 33/11KV S/S Dhoommanikpur, Dadri. 36 Safe carriage of following stock material, from any of the Store Center of PVVNL to work siteincluding Loading from Store and safe unloading at site for Item No. 37 to 49 37 11KV XLPE Cable 3x185sqmm 38 ST POLE 11MTR 39 ACSR DOG CONDUCTOR 40 11KV CROSS ARM 41 11 KV T OFF CHANNEL 42 11KV PIN INSULATOR 43 11KV DISC INUSLATOR 44 GUARDING ANGLES 65X65X6 45 STONE PAD 46 TOP CHANNEL 47 DROPPER CHANNEL 48 11KV O/D Termination Kit for 3x185sqmm XLPE Cable 49 EARTHING COMPLETE 50 Errection of above Following material and Supply and errection of the DE-CENTRALISED material for completing the works as per RESPO. 51 The excavation of foundation pit in mix soil/normal soil/soft soil & hard rock as per site condition and its back filling and leveling etc. The size of the pit will be (750x450)mm and having depth of 1/6th of the full length of the support. Erection of support, complete with providing & fixing of all G.I.Clamps size of 75x10mm, 65x8mm, G.I.Nut bolt & washer, P.G.Clamp, Stone Pad, Al. Binding wire, E bracket 75x10mm, and other accessories as per drawing. The work includes carriage and handling of supports from sectional store to pit site as well as any fabrication work if required & fixing of cross bracing sets 4.3mtr long, from G.I.Angle 65x65x6mm. The work includes cutting holes and providing G.I.Bolt of 16x40mm size, in the middle of the cross bracing with 01No. spring washer of proper size as per drawing/ as per schedule.Double Pole Structures(a)ST POLE 11MTR 52 The excavation of foundation pit in mix soil/normal soil/soft soil & hard rock as per site condition and its back filling and leveling etc. The size of the pit will be (750x450)mm and having depth of 1/6th of the full length of the support. Erection of support, complete with providing & fixing of all G.I.Clamps size of 75x10mm, F bracket 75x10mm, G.I.Nut bolt & washer, Stone Pad Al. Binding wire and other accessories as per drawing. The work includes carriage and handling of supports from sectional store to pit site as well as an fabrication work if required.Single Pole(a) ST POLE 11 MTR 53 Grouting of supports in CC 1:3:6 (Cement, sand & 20mm stone grift). Grouting will be done in the block of size (450x450)mm x1/6th of full length of the support, upto ground level, 300mm plinth above the ground level with C.C. 1:3:6 (Cement, Course sand and Stone grift) with muffing as per RESPO. Work includes back filling and proper ramming.Single Pole and Double Pole(a)ST POLE 11 MTR 54 FIXING OF PIN INSULATOR WITH PIN, COMPLETE WORK IN ALL RESPECT. 55 FIXING OF TOP CHANNEL AS PER SITE REQUIREMENT. 56 FIXING OF DROPPER CHANNEL AS PER SITE REQUIREMENT. 57 FIXING OF STONE PAD AS PER SITE REQUIREMENT. 58 FIXING OF 11KV CROSS ARM WITH COMPLETE WORK IN ALL RESPECT. 59 FIXING OF 11KV T OFF CHANNEL WITH COMPLETE WORK IN ALL RESPECT AS PER SITE REQUIREMENT. 60 FIXING OF 11KV DISC INSULATOR WITH FITTINGS AS PER SITE REQUIREMENT. 61 FIXING OF GUARDING ANGLES AS PER SITE REQUIREMENT 62 Supply of 160mm OD PN-4-PE-80 Grade UV Stabilized HDPE Pipe.(PVVNL GTP APPROVED) 63 Drilling of dia 220 mm in two parallel bores for Double Curcuit by trenchless method by horizontal boring machine at a depth of 1.50 mtrs to 2.50 mtrs. (as requirement at site) below the ground level with complete work in all respect as per RESPO. 64 Laying ofHDPE Pipe PE-80, PN-4, DN-160mm dia by HDD trenchless method for 11KV, 3x185sq.mm XLPE cable as per site requirement. (PVVNL GTP APPROVED HDPE PIPE SHALL BE SUPPLIED WITH INSPECTION.) 65 Laying and commissiong of 11KV 3x185sqmm XLPE CableDouble Ckt. in HDPE Pipe dia after digging HDD trenchless methodboring including complete connections at both ends after providing and crimping of lugs of proper size for completion of work.as per site requirement. 66 Digging of pits of size 4 mtr x 4 mtr x 1.5 mtr for cable loop and making risers at double pole and re-filling of pits in proper manner with required material at kacha/pakka and hot mix road. (All Work and materialin the scope of contractor) 67 Laying of 11 KV 3X185 Sq.mm XLPE Cable in the air on cable Riser Double Pole, existing trench cable trench, nala x-ing & G.I.Pipe and making connection complete at both ends. 68 Preparation and Fixing of 11 KV Power Cable ends:Making and Fixing of 11 KV XLPE Heat shrinkable outdoor jointing kits suitable for 3x185sqmm XLPE Cable after duly plumbing and taping of cable, providing, fixing and crimping of proper size good quality lugs with complete connention in all respect. 69 Driving of MSearth rod of size20x2500 mm in earth andjointing through G.I. wire of 6 SWG between support and earth electrode by providing proper size of bolts and nuts for pole earthing. Supply Erection, fixing, grouting of stay rod in cement, sand and brick ballastin ration 1:4:8 in Block 600*600*300 mm with binding & nuzzlingincluding providing & fixing of stay insulator complete in all respect with grouting. (All Work and Material in the scope of Contractor) 70 Laying, spreading, lifting and final sagging of 3 OR 4phases ACSR Dog conductor in accordance with Line chart includidng binding and fixing of all accessories in 03Nos OR 04 Nos. Conductor in parallel as per site requirement. 71 PROVIDING AND FIXING OF HOLDING CLAMP AS PER REQUIREMENT. 72 PROVIDING AND FIXING OF EYE BOLTS AS PER REQUIREMENT. 73 PROVIDING AND FIXING OF11KV F BRACKETAS PER REQUIREMENT 74 Providing and Fixing of GI Pipe 6 Dia as per site requirement. 75 Providing and Fixing of GI Wire 4&8 SWG 1/5mm as per site requirement. 76 Road Cutting and Road Restoration Charges for the above work. 77 Removal and Dismentaling of old and used Conductor from the site and safe carriage of its from the site to any store of PVVNL DISCOM including loading and un-loading both ends. 78 Removal and Dismentaling of old and Damaged PCC Pole from the site and safe carriage of its from the site to any store of PVVNL DISCOM including loading and un-loading both ends. 79 Removal and Dismentaling of old and Damaged Cross Arm from the site and safe carriage of its from the site to any store of PVVNL DISCOM including loading and un-loading both ends.
|