Part 1: Execution Of Construction Works. The Scope Of The Order Includes The Execution Of Construction Works: 2.1. Carrying Out Road Works In The Scope Of: 1) Measurement Works Over A Length Of 1,503.00 Meters, 2) Demolition Works, 3) Renovation, Cleaning And Sprinkling Of The Existing Surface, 4) Adjustment Of External Devices, 5) Execution Of A Renovation And Leveling Layer Of The Road From A Mineral-Mineral Mixture Ac 11S Asphalt In An Amount Of Up To 50 Kg/M2 Cm, On The Road Section, 6) Making A Wearing Course Of The Road From The Mixture Mineral And Asphalt Ac 11S Thickness 5 Cm, - On The Road Section,7) Construction Of A Roadside Made Of Stone Aggregate With A Width Of 0.75 M To 1.00 M,8) Maintenance Of Roadside Ditches,9) Installation Of A New Concrete Curb And Placing Them On A Concrete Footing,10) Cleaning And Replacement Of Existing Sewage Grates And Sewers,11) Replacing Vertical Markings And Installing Horizontal Markings,2.2. Execution Of Accompanying Works In The Scope Of: 1) Adjustment Of Manholes, 2) Cutting And Clearing Dense Bushes Located In The Road. Tidying Up The Construction Site And Restoring The Original Condition Of Disturbed Structures (Reconstruction Of Roads, Sidewalks, Slopes, Ditches, Planting And Topsoiling Of Roadsides And Green Belt, Sowing Grass). 3) Execution And Implementation Of A Traffic Organization Change Project .3. A Detailed Description Of The Subject Of The Order Is Included In The Annexes: No. 3 To The Swz Called Technical Documentation; No. 4 To Swz Called Target Traffic Organization Project; No. 5 To The Swz Called Technical Specification For The Execution And Acceptance Of Construction Works (Stwiorb); No. 6 To Swz Called Bill Of Quantities.4. The Subject Of The Order Must Be Performed In Accordance With The Specification Of The Terms Of Order, The Act Of July 7, 1994 - Construction Law (Journal Of Laws Of 2024, Item 725, As Amended), Technical Documentation, Detailed Technical Specification (Sst), Target Traffic Organization, Bill Of Quantities As Well As Other Documents Developed For The Purposes Of This Order And Applicable Regulations And Standards, Construction Practice, Principles Of Modern Technical Knowledge, Ensuring Safe And Hygienic Working Conditions, Including For Road Users.5. If The Description Of The Subject Of The Contract Includes References To Standards, Technical Assessments, Technical Specifications And Technical Reference Systems Referred To In Art. 101 Section 1 Point 2 And Section 3 Of The Act, The Ordering Party Allows Solutions Equivalent To Those Described. 6. If The Documentation Describing The Subject Of The Order (I.E. In Designs, Technical Specifications For The Execution And Acceptance Of Construction Works, Bills Of Quantities, Lists, Forms) Includes The Names Of Manufacturers, Patents, Brands, Trademarks, Or Technical Approvals, Standards, Technical Specifications Or Systems Reference, The Ordering Party Allows Offering Solutions Equivalent To Those Described, Provi
|