The Subject Of The Order Is The Task Titled: Preparation Of Design And Cost Estimate Documentation Along With The Transfer Of Copyrights, Taking Into Account The Employers Comments, Recommendations And Guidelines As Well As Comments And Necessary Additions Required By Institutions Giving Opinions Or Approving Individual Parts Of The Design Documentation For The Task Titled: Reconstruction Of A District Road No. 1368 D Along With The Construction Of A Pedestrian And Bicycle Route In Ligota Piękna, Commune. Wisznia Mała. The Design Works Include A Road Section Of Part Of The District Road 1368D In The Town Of Ligota Piękna With A Total Length Of 1,105.36 Meters. The Beginning Of The Planned Pedestrian And Bicycle Route Is At The Intersection With Dw 359 (Former Dk 5), While The End Is At The Intersection With Ul. Leszczynowa. The District Road No. 1368 D Has Class L. The Project Should Cover In Particular: • Plot No. 449/1 Dr, Am -1, Ligota Piękna Precinct, Wisznia Mała Commune, • Plot No. 449/2 Dr, Am -1, Ligota Piękna Precinct, Wisznia Mała Commune, Plot No. 445 Dr, Am-1, Ligota District Piękna, Wisznia Mała Commune, • Plots Covered By Geodetic Divisions In Accordance With The Zrid Decision. Material Scope: - The Total Length Of The Sidewalk Planned For Construction Is 1105.36 M. In Particular, The Following Should Be Designed: A) A Pedestrian And Bicycle Route Made Of Bituminous Mass With A Width Of Approx. 3 M Along With Curbs, Gullies And Drains To Ensure Compliance With The Regulation Of The Minister Of Infrastructure Of June 24, 2022 On Technical And Construction Regulations Regarding Public Roads (Journal Of Laws 2022, Item 1518), Located On The Right Side From Dw 359 To The Intersection With Ul. Lipowa, And Then On The Left Side To Ul. Leszczynowa. On The Left Side From Dw 359 To The Entrance To The Dino Store, You Should Design A Sidewalk Made Of Bituminous Mass, Approx. 2 M Wide And Approx. 40 M Long, Ending With A Pedestrian Crossing, B) Design Individual And Public Exits, C) Prepare An Inventory Of Greenery And Materials Necessary To Obtain A Decision To Cut Down Trees, D) Design Drainage In The Form Of A Storm Sewage System From Dw 359 To Aleja Brzozowa And A Surface Sewage System On The Remaining Section To Street Leszczynowa,E) Divide The Plots And Obtain A Zrid Decisionf) Obtain An Environmental Decision,G) Prepare A Water And Legal Report,H) Design The Reconstruction Of Conflicts With The Existing Energy, Gas, Water And Telecommunications Infrastructure,I) Design A Change In The Geometry Of The Road,J) Design Widening An Engineering Structure On A Watercourse, K) Design A Service Channel Or Obtain A Derogation From The Need To Build It, L) Prepare A Design For Permanent Traffic Organization,Ł) Agree With The Wisznia Mała Commune On A Smooth Connection With The Designed Pedestrian And Bicycle Route Running From The Town Of Malin,M) Perform Authors Supervision Until The Defect-Free Acceptance Of Construction Works Performed On The B
|