From Aardeken To Zuiderdijk 25 The Stabilization Consists On The One Hand Of Inserting Steel Profiles In Order To To Stabilize The Slope And On The Other Hand To Renew The Erosion Protection Of The Toe And The Bank Of The Slope. This So-Called Nailing Ensures That More Shear Resistance Is Added In The Potential Sliding Surfaces, Which Increases The Overall Safety With Regard To Sliding. The Nailing With Discrete Piles Has The Additional Advantage That The Groundwater Flow To The Scheldt Is Not Prevented. In Addition To Stabilization, A Sigmakering Up To 8M Taw Must Also Be Constructed To Prevent Flooding During Storm Tides. For This Purpose, The Existing Flood Defense Must Be Increased From Approximately 7.5M Taw To 8.0M Taw. Furthermore, The Construction Of A Concrete Jetty At The Kennof Company Is Planned, Which Will Be Connected To The Public Road And The Company Itself.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 88643283
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.