Special Repair Work Of Lucknow-Sultanpur Road To Rakeebabad Link Road - Construction of embankment with approved material obtained from availble land as permitted and approved byEngineer-in-Charge and as per Technical Specitaion Clause 301.3.4.1,with all liftsand leads,spreading, grading to required slope and compacting to meet requirement of Tables 300.1and 300.2 as per Technical Specification clause 301.5 (Excluding GST) 2 Providing ,Laying ,spreading and compacting stone aggregates of 53-22.4 mm size to water bound macadam specification including spreading in uniform thickness , hand packing ,rolling with Smooth wheel roller 80-100 KN in stages to proper grade and camber ,applying and brooming ,Stonescreening to fill up the nterstices of coarse aggregate ,watering and compacting to the required density. (Excluding GST) 3 Providing and applying primer coat with bitumen emulsion (SS) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/sqm using mannual means. (Excluding cost of Emulsion) (Excluding GST) 4 Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mmgrit @ 1.80cum. per 100 sqm , 11.2 mm. grit @ 0.90cum per 100 sqm using penetration grade bitumen 146 kg per 100 sqm.including cost of labour at plant and laying site as required and T&P etc but excluding cost of bitumen , Hire charges of plant, Transportation of mix material with tipper and laying with paver finisher finished to required level and grades as per Technical Specification Clause 508.and inclunding tack coat over Bituminious surface. (Excluding GST) 5 Providing, laying Seal coat Type C over P.C. surface with crushed stone chipping 6.7 mm. nominal size @ 0.90cum per 100 sqm using penetration grade bitumen VG-10 @ 0.65 kg per 100 sqm.including cost of labour at plant and laying site as required and T&P etc but excluding cost of bitumen, Hire charges of plant, Transportation of mix material with tipper and laying with paver finisher finished to required level and grades as per Technical Specification Clause 510. (Excluding GST) 6 Laying reinforced cement concrement pipe 350mm for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation,protection works,back filling,concrete and masonary works in head walls and parapets (Excluding GST) 7 Construction of subgrade with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as perTechnical Specification Clause 301.5 complete in all respects.(Including all material, labour & T&P (Excluding GST) 8 Constructionof plaincementconcretepavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M 30 (Grade), coarse and fine aggregates conforming to IS: 383,maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501. (Excluding GST)
|