Part 1: Preparation Of Design Documentation For The Expansion Of District Road No. 2645G From The Town Of Sławęcin To The Town Of Dąbrówka (Path). A Detailed Description Of The Subject Of The Order Is Included In The Swz And In The Draft Contractual Provisions Constituting An Annex To The Swz.1. The Study Should Include The Construction Of A Bicycle Path On The District Road No. 2645G At Km From 10+210 To 11+418 - In Accordance With The Graphic Attachment Constituting Annex No. 1 To The Description Of The Subject Of The Order. The Documentation Will Constitute An Attachment To The Application For A Decision To Implement A Road Investment - The Total Length Of The Section Is 1,208 Km. Scope Of Design Works: - Designing A Bicycle Path On A Section Of 1,208 Km, The Beginning Of The Bicycle Path At The End Of The Existing Sidewalk, The End Of The Bicycle Path - The Border Of The Chojnice Poviat, - Designing A Safe Bicycle Route To The Newly Designed Bicycle Path At The District Road No. 2647G, - Designing Lighting Bicycle Journeys, - A Two-Way Bicycle Path With A Width Of 2.5 M, - A Bicycle Path Moved Away From The Road On The Right Side In Accordance With The Increasing Mileage, - A Bicycle Path With An Asphalt Surface Without A Border, - Designing The Target Traffic Organization, - Obtaining An Effective Exemption From The Obligation To Build A Technological Channel From The Minister Responsible For Computerization (Minister Of Digitization), - Designing The Removal Of Collisions With Underground And Above-Ground Infrastructure - If They Occur, - Preparing Documentation On A Geodetic Basis For Design Purposes With Raised Boundaries Of The Road (The Boundaries Of The Road Should Be Found, Determine If Necessary), - The Documentation Must Be Based On Geological Research. 2. Completion Date: Up To 11 Months From The Date Of Conclusion Of The Contract 3. Designs For The Division Of Plots Necessary For The Implementation Of The Task: - Basic Orders: Execution Of 2 Designs Of Divisions Of Real Estate, - Order Under The Option Law: Execution Of Up To 2 Designs Of Divisions Of Real Estate4. The Designer Will Provide Design Studies In The Following Quantities: - Land Development Design - 4 Sets. In Paper Version, - Architectural And Construction Design - 3 Sets. In Paper Version, - Technical Projects For All Industries - 4 Sets. In A Paper Version, - Permanent Traffic Organization Design Approved By All Necessary Authorities With Possible Comments - 3 Sets. In Paper Version, - Bills Of Quantities - 2 Sets. In Paper Version, - Technical Specifications For The Execution And Acceptance Of Construction Works - 3 Sets. In Paper Version, - Investors Cost Estimate - 2 Sets. In A Paper Version, - Electronic Version Of The Studies Listed In Points 1-6 On A Cd - 2 Pieces, Containing A Digital Record Of The Design Documentation: Drawings In Pdf And Dwg Format, Text In Pdf And Doc (Ms Word) Format, Bill Of Quantities And Cost Estimate Investors Report In Pdf And Doc (M
Contact Information
Address
Powiat Chojnicki,Chojnice,89-600,Pomorskie,Pl637 - Chojnicki
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 88598633
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.