1. Part I, Which Includes: A. Renovation Of The Premises At Ul. Holenderska 29/3, 64 – 100 Leszno - Washing And Scraping Off Old Paint, - Dismantling Partition Walls, - Priming Substrates With A Primer, - Applying Plaster On Walls And Ceilings, - Replacing Ventilation Grills, - Painting Walls And Ceilings, - Tearing Off Floor Strips ,-Removing The Floor Covering,-Dismantling The Concrete Floor,-Removing The Soil,-Insulating The Walls,-Constructing Concrete Bases For The Floors,-Constructing The Floor,-Constructing Moisture-Proof And Thermal Insulation,-Constructing Partition Walls,-Replacing Door Joinery,- Enlarging Door Openings, - Making A Partition Wall From Plasterboards On A Steel Grid, - Laying Osb Floor Boards, - Laying Floor Coverings, - Installing Floor Strips, - Making A Tile Floor In The Bathroom, - Replacing Window Joinery, - Replacing The Electrical Installation, - Renovation Of The Water And Sewage System, - Replacement Of A Sink With A Tap, - Replacement Of A Washbasin With A Tap, - Replacement Of A Bathtub With A Shower Tray, - Replacement Of A Toilet Bowl In The Set, - Replacement Of A Gas Stove, - Internal Tightness Test. Gas Installation, - Start-Up Of The Gas Boiler, - Disassembly And Installation Of Steel Plate Radiators, - Removal And Disposal Of Rubble, 2. The Detailed Scope Of Works And The Method Of Their Execution Are Described In The Bills Of Quantities, Design Documentation And In The Technical Specification For The Execution And Acceptance Of Construction Works (Stwiorb), Which Constitute Appendices To The Swz (Appendix No. 10A) And Are Posted Together With It On The Website Https: //Platformazakupowa.Pl/Pn/Mzbk_Leszno 3. The Contractor Himself Will Assess The Final Scope Of Works Based On The Technical Documentation And Bills Of Quantities In Accordance With Annex No. 10A To Swz, 4. Due To The Specific Nature Of The Order, It Is Recommended That The Contractor Conduct A Site Visit Of The Work Site . 5. The Ordering Party Will Enable A Site Inspection Of The Facility At A Previously Agreed Date From Monday To Friday From 7:30 A.M. To 2:30 P.M. With The Participation Of A Designated Representative Of The Building Manager (Mzbk) - After Prior E-Mail Contact To The Following Address: Rekruti@Mzbk-Leszno.Pl, With Mr. Zdzisław Loman. 6. The Costs Of On-Site Inspection Of The Work Site Will Be Borne By The Contractor. 7. The Ordering Party Does Not Require The Contractor To Visit The Site Or Check The Documents Necessary To Complete The Order, Available On-Site At The Ordering Party. 8. The Ordering Party Specifies The Requirements Related To The Implementation Of The Order, Which Include Environmental Aspects Resulting From The Provisions Of Art. 68 Section 3 Of The Act Of January 11, 2018 On Electromobility And Alternative Fuels (Consolidated Text: Journal Of Laws Of 2024, Item 1289), On The Terms Described In The Contract Template Constituting Annex No. 8 To The Swz. 9. Documents And Other Information Regarding The Subje
|