1. The Subject Of The Order Are Construction Works Related To The Construction Of A Heating And Hot Water Installation In A Multi-Family Residential Building At Ul. Fr. Konstantego Budkiewicza 17 In Ząbki.1.1. Scope Of Works For The Internal Water And Sewage System: - Making Excavations For Sanitary Sewers, Grooves And Punctures, - Marking The Place For Laying The Pipes, - Removing The Pipes, - Backfilling The Trenches With Soil From The Excavations, - Making Punctures In The Foundation Walls, Ceilings And Walls, - Execution Horizontal And Vertical Grooves In The Walls.1.2. Scope Of Execution Of The Hot Water Installation: - Installation Of Pipelines, - Installation Of Draw-Off, 2-Way And Non-Return Valves Fi15-32 Mm, - Installation Of Washbasin And Sink Faucets, - Safety Valve, - Cutting And Bricking Up Grooves, - Painting Walls, - Laying Thermal Insulation.1.3 . Scope Of Works In The Field Of Central Heating Installation Installation: - Plastic Fittings 15-32 Mm, - Plastic Water Pipes 15-32 Mm, - Installation Of Seamless Steel Pipes, - Installation Of Globe Valves: - Dn 15 - 32 Mm, - Installation Of Automatic Vent Valves Dn15 Mm, - Installation Of Panel And Bathroom Radiators, - Installation Of Gas Boilers, - Tightness Test And Adjustment Of The Installation, - Making Horizontal Grooves In Brick Walls, - Making Holes In Walls And Ceilings, - Performing A Tightness Test, - Making Grooves Horizontal In Brick Walls, Making Penetrations In Walls And Ceilings. 1.4. Scope Of Works Regarding The Installation Of The Ventilation System: - Piercing Holes For Ventilation Ducts, - Installation Of Ducts With A Diameter Of 100 To 400 Mm, - Installation Of Rectangular Ducts, - Installation Of Wall And Roof Air Intakes And Outlets, - Installation Of Air Supply Grilles - Anemostats With Adjustable Capacity, - Installation Of Thermal Insulation Of Pipes, - Installation Of Ventilation Devices. 2. The Ordering Party Informs That The Building At Ul. Street Fr. Konstantego Budkiewicza 17 In Ząbki Is An Inhabited (Active) Multi-Family Residential Building, Which The Contractor Should Take Into Account During The Implementation Of The Works In Order To Minimize Any Associated Nuisances.3. A Detailed Description Of The Order And Requirements Regarding The Method Of Execution And Acceptance Of The Works Are Specified In: - Technical Specification For The Execution And Acceptance Of Construction Works - Annex No. 3 To The Swz, - Documentation - Annex No. 4 To The Swz, - Bill Of Quantities - Annex No. 5 To The Swz.
|