Ventilation Installation Work – Ventilation Systems New Building Extension Kgs Buisdorf. Four Ventilation Systems, New Extension To The Catholic Elementary School In Buisdorf, City Of Sankt-Augustin, Including A Regeneration Kitchen And A Cafeteria. Appendix 1: Classrooms And Multi-Purpose Rooms On The Basement And Upper Floors With 6,250 Cbm/H With Heat Recovery System. Appendix 2: Kitchen And Cafeteria On The Ground Floor With Supply Air 7,000 Cbm/H / Exhaust Air 5,300 Cbm/H. With Wrg Appendix 3: Social Rooms / Toilet Rooms On The Ground Floor 700 Cbm/H. Appendix 4: Roof Fan Kitchen Exhaust Air The Technology Center Is In The Basement. With Duct System, (Insulated), Fire Dampers, Volume Flow Controllers And Outlets. Two Air Conditioning Split Units For The Ela Room And A Warehouse. The Outside Air Is Preheated To The Device Using A Geothermal Heat Exchanger; This Is Not Part Of The Tender. The Msr/Control Cabinet Is Also Advertised Separately.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 88593825
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.