Engineering Design Services – Planning Services For The Replacement Of The Spree Canal Weir. The Planning Services Serve The Goal Of Constructing A Replacement Weir In The Spree Canal, Where A Fish Changing System (Fwa) Can Be Retrofitted. The Planning Services And Planning Steps Are Based On The Administrative Regulations Of The Wsv, In Particular The Vv-Wsv 2107 “Draft List”. The Planning Services Conclude In The First Step With A Preliminary Investigation In Which A Preferred Variant Must Be Identified. The Draft Hu And The Draft Au Must Then Be Drawn Up. The Planning Services Also Include Participation In The Awarding Of Construction Services. The 1-Field Spree Canal Weir System (Built In 1936), Consisting Of A Weir Closure And A Sealed Boat Lock, Is Located At Km 0.9 Of The Spree Canal (Kupfergraben), As A Tributary Of The Sow (Spree-Oder Waterway). The Spree Canal Weir System Is Part Of The Mühlendamm Barrage With The Mühlendamm Weir And The Mühlendamm Ship Lock System. Renovating The Spreekanal Weir Is Not Economically Justifiable. The Planning For The New Replacement Building On The Spree Canal Must Be Geared Towards Construction Starting As Soon As The New Mühlendamm Weir Replacement Building Is Safely Functional (Probably 2027/2028). The Location Is Centrally Located In The City Center. The Water Level Difference Between Upper And Lower Water Is Approx. 1.5 M. The Maximum Discharge (Hq 100) Is Approx. 40 M³/S, The Average Discharge Is Approx. 8 M³/S. The Weir Is Listed In The Berlin Monument List. Ammunition Contamination Is To Be Expected. Because It Is Currently Not Foreseeable Which Solution Will Later Be The Most Sensible For Improving Ecological Continuity (Öd) On The Spree Canal, The New Replacement For The Spree Canal Weir Should Be Designed In Such A Way That It Should Be Possible To Retrofit A Fish Changing System That Is Tailored To A Need That Will Be Determined Later Is. The Current Preparations To Replace The Dilapidated, 1-Field Weir System On Mühlendamm With A 2-Field Replacement Building Are Not Part Of This Planning Service. The New Facility On Mühlendamm Also Includes A Fish Ladder (Faa) And A Fish Ladder. The Planning Services Mainly Include The Trades - Solid/Civil Engineering Construction - (Special) Civil Engineering Including Underwater Concrete Base - Hydraulic Steel Construction - Mechanical Engineering - Electrical Engineering/Communications Engineering - Demolition Of The Existing Weir System The Main Elements Of The Structure Are: - Weir System With Closure - Constructive Solution (“Placeholder”) ) For Retrofitting A Fish Changing System - Drives And Controls Including Connection To The Mühlendamm Weir System And The Grünau Remote Control Center - Connections To The Upper And Lower Water The Planning Should Be Carried Out Through All Planning Steps According To Vv-Wsv 2107, Including Coordination Of The Planning And Everyone Involved In The Planning. The Following Documents Should Be Created And Services Provided: 1. Preliminary Investigation (According To Vv-Wsv 2107) With All Necessary Evidence And Confirmations
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 88589437
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.