Electrical Wiring And Fitting Work – Installation Elektrotechnik. The Following Work Has Already Been Carried Out On Site: - Dismantling The Existing Building - Exploding Ordnance - Bored Pile Walls - Support Pile Walls - Dewatering - Excavation Work - Sanitary Containers - General Construction Site Equipment The Dewatering Is Carried Out Via Wells Located Outside The Construction Pit And Relief Wells Within The Construction Pit. The Wells Outside The Excavation Pit Must Remain Continuously Accessible. The Tendered Work Includes The Following Areas: - Electrical Trades In The New Building, Component F - Construction Of A New Electrical Energy Supply Center For The Entire Property - Data Connection To The Existing Building Electrical Trades In The New Building, Component F This Includes The Installation Of The Electrical Systems In Cost Groups 440 & 450, As Well As The Construction Of Two Elevator Systems In Cost Group 460, In Detail: Kg 440: A New Transformer And Medium-Voltage System, Low-Voltage Main And Sub-Distribution, A Photovoltaic System, A Central Battery System For The Escape Sign And Safety Lights, As Far As Possible Supply Of The Office Workstations Via An Underfloor System, Lighting Systems In Led Technology Via The Building Automation And Dali Technology Controlled According To Needs And Energy Efficiently, External Lightning Protection System According To Lightning Protection Class Iii. Kg 450: Paging Systems In The Disabled Toilets, Passive Data Network, Integrated Into The Underfloor System At The Workstations. Energy Supply Center In The New Building, Component F, A New Medium-Voltage Main Distribution Is Being Built, Which Supplies The New Building And The Existing Component A Via Two Transformers, Each With 1,000 Kva. The Previous Medium-Voltage Network Access Point In Component D Will Be Removed And The Two Existing Transformers, Each With 630 Kva, Will Be Supplied From The New Medium-Voltage Main Distribution. Data Connection To The Existing Building Data-Side Integration Into The Clients Intranet In Components A And E, This Is Done Via Om 4 Fiber Optic Cables With 48 Fibers Each.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 88588255
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.