Mechanical Installations – Elevator System. Delivery And Ready-To-Use Installation Of A Passenger Elevator For The New Kgs Buisdorf Extension Building From The Basement To The Upper Floor In Accordance With En 81 1/2, En 81-20, En 81-50 And En 81-70 In Accordance With The System Representation In Drawing No. 967-320, In Particular: Delivery Of The Shaft Installation Parts (Anchor Rails, Lifting Eyes, Etc.) Including Dimensioned Installation Plans/Instructions To Shell Construction Contractor. Setting Up The Elevator Shaft Delivery And Ready-To-Use Assembly Of The Complete System According To The Lv Description In Delivery And Ready-To-Use Assembly Of The Elevator Control Cabinet Including The Main Switch. Ready-To-Use Connection Of The On-Site Supply Cable For The Elevator Control Cabinet And The Cabin Light, Including Delivery And Ready-To-Use Installation Of The Safety Elements To Be Connected Upstream. Delivery, Ready-To-Use Assembly And Connection Of All Energy And Control Cables From The Elevator Control Cabinet And For The Cabin Light And Shaft Lighting
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 88588172
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.