Tenders Are Invited For Load-Bearing Structure Design Services – 2024-0317, Structural Planning, Extension T ... in Germany
Tender Notice
TenderID
88586710
Tender Brief
Tenders Are Invited For Load-Bearing Structure Design Services – 2024-0317, Structural Planning, Extension To A Three-Room Structure And Construction Of A Cafeteria - Ggs Wuppertalstraße, Wuppertalstr. 10, 51381 Leverkusen
Load-Bearing Structure Design Services – 2024-0317, Structural Planning, Extension To A Three-Room Structure And Construction Of A Cafeteria - Ggs Wuppertalstraße, Wuppertalstr. 10, 51381 Leverkusen. The Bergisch Neukirchen Community Primary School Is The Only Primary School In The Leverkusen Districts Of Bergisch Neukirchen And Pattscheid. It Consists Of Three Buildings Of Different Ages. Main Building The Main Building With The Administration Area, The Teachers Room And Eight Classrooms As Well As A Toilet Facility Was Built In 1968 And Was Subsequently Fitted With A Cold Roof A Few Years Ago. The Windows And External Doors Were Also Renewed In 2021. The Building Has Significant Deficits In Terms Of Accessibility. A Second Structural Escape Route Is Also Missing. Extension Building In 1971, The Three-Story Extension Building Was Built As A Reinforced Concrete Frame Structure With A Facade Made Of Prefabricated Concrete Elements With An Exposed Concrete Look. A Cold Roof Was Also Added Here A Few Years Ago. The Extension Building Houses 6 Classrooms On The Above-Ground Floors And Two Multi-Purpose Rooms In The Basement. The Cafeteria With Warm-Up Kitchen Is Currently Housed In The Two Classrooms On The Ground Floor. However, This Is Only A Temporary Solution. There Is Another Toilet Facility In An Adjacent Building. There Are Also Deficits In Accessibility Here And There Is No Second Structural Escape Route. Sports Hall The Renovation Or Conversion Of The Sports Hall Is Not Part Of This Project. Goals And Measures The Goal Is To Convert The Bergisch Neukirchen Community Primary School Into A Three-Class School For Up To 360 Students With A Cluster Structure And Open Learning Areas, As Well As An Ogs Area. The Open All-Day Area And The Cafeteria With A Regeneration Kitchen Should Offer Space For Around 100 To 120 Students, So That All Students Can Eat In The Three-Shift System. In Addition, Sufficient Space Must Be Taken Into Account For The Approximately 35 Employees In The Areas Of Pedagogy, Ogs And Administration. The Space Program Provides For A Total Space Requirement (Not Taking Into Account The Sports Hall) Of Around 2,250 M2 Of Net Space. As Far As This Is Possible And Sensible, The Buildings Receive Green Roofs (Extensive) And, If Necessary, Green Facades. School Operations Must Be Maintained Throughout The Entire Period Of Implementation Of The Project. In Principle, Several Solution Approaches (Maintenance And Renovation Of All Existing Buildings Or (Partial) New Construction) Are Conceivable And Should Be Checked As Part Of The Planning, Taking Into Account Factors Such As Costs, Sustainability And The Maintenance Of Ongoing Operations. For This Reason, The Investigation Of An Additional Solution Approach Is Requested In Commissioning Stage 1. Framework Conditions Of The Order The Basis Of The Order Is The Hoai In The Valid Version. The Commissioning Takes Place In Stages. The Commissioning Of Stages 2 And 3 Depends On The Decisions Of The Responsible Political Committees And Can Therefore Not Be Guaranteed. To Prepare
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 88586710
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.