Harbor Construction Works – Sheet Pile Renovation In The Outer Harbors Of The Niegripp Lock. The Main Construction Work To Be Carried Out Is Divided Into 2 Sub-Projects In The Area Of The Niegripp Lock: Inner Port: (Sub-Project 4) • Construction And Dismantling Of A Cofferdam During Construction • Renewal Of The Bank Sheet Piling On The South Side • Creation Of Traffic Areas On The South Side Outer Harbor: (Sub-Project 5) • Dismantling The Railings (South Side) • Creating And Dismantling A Cofferdam From The Construction Period • Renewing The Bank Sheet Pilings On The North Side And South Side • Partial Dismantling Of The Traffic Area Pavement (South Side) • Production Of The Railings (North And South Side) • Restoration And Addition Of The Traffic Area Pavement (South Side) The New Bank Walls Are To Be Constructed With Micro Grouting Piles And Equipped With Niche Bollards, Vertical Ladders And Handholds. The Equipment In The Bank Areas Must Be Secured Or Adjusted During Construction.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 88583896
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.