A. Basic Scope (Guaranteed).The Basic Scope Includes:1. Earthworks And Demolition Works, Protection Of Trees In The Historic Park During Construction In The Basic Scope.2. Construction Of A Safe Surface For The Streetworkout Set.3. Delivery And Assembly Of The Streetworkout Kit.4. Construction Of The Communication Part In The Form Of Hardening With A Granite Edge.5. Preparation And Installation Of A Board With Regulations.6. Construction And Connection Of A Video Monitoring System Consisting Of Two Cameras, Including The Purchase Of A Genetec License And The Launch Of Registration In The City Monitoring System.7. Construction Of Area Lighting On New Poles And Led Fixtures, Along With Its Connection To The Power Supply From Local Park Lighting.8. Creating A Lawn From Basic Seeding. B. Scope Of The Order Covered By The Option Law:1. The Scope Of The Optional Order Includes: 1) Earthworks And Demolition Works, Protection Of The Trees Of The Historic Park During Construction Within The Scope Covered By The Option Law. 2) Construction Of A Safe Surface For Exercise Equipment: Barbell Squats, Overhead Lift, Runner, Hand Press, Twister. 3) Delivery And Installation Of Exercise Equipment: Barbell Squats, Overhead Pulley, Runner, Hand Press, Twister.4) Construction Of A Lawn From Sowing Within The Scope Covered By The Option Law.2. The Ordering Party Reserves The Right To Increase The Basic Order By The Scope Covered By The Option Right. The Ordering Party May Exercise The Option Right If It Has Financial Resources. 3. The Ordering Party Will Notify The Contractor In Writing About The Exercise Of The Option Right Within 60 Days From The Date Of Signing The Contract.4. All Provisions Of The Agreement Regarding The Implementation Of The Basic Order Shall Apply Accordingly To Orders Implemented Under The Option.5. If The Ordering Party Does Not Use The Option Right, The Contractor Is Not Entitled To Any Claims In This Respect.6. Settlement Method: As For The Basic Order.7. The Deadline For Completing An Order Covered By The Option Right Is Counted From The Date Of Re-Handover Of The Construction Site And Is 60 Days.C. The Execution Of The Order Also Includes: (Applies To The Basic And Optional Scope): 1. Preparation Of As-Built And Acceptance Documentation And Its Delivery To The Ordering Party By The Date Of Reporting The Completed Works, In Paper And Electronic Form.2. Providing Comprehensive Surveying Services For The Investment, Including Post-Construction Surveying Inventory, In Four Sets (Including 1 Set On An Electronic Medium). On The Day Of Acceptance Of The Final Works, The Employer Will Require Geodetic Documentation From The Contractor, Containing The Results Of The As-Built Geodetic Inventory, Including The Map Referred To In Art. 2 Point 7B Of The Act Of May 17, 1989 - Geodetic And Cartographic Law, I.E. The Results Of As-Built Measurements, Including An Annotated Map, Taking Into Account Art. 12C Section 1, The Official Clause Referred To In A
Contact Information
Address
Gmina Kędzierzyn-Koźle - Urząd Miasta,Kędzierzyn-Koźle,47-220,Opolskie,Pl524 - Opolski
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 88535710
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.