Reconstruction Of The Road In Szczepanów, Plot No. 228, 229, 273, 2381. The Subject Of The Order Is Implemented In The Design And Build Formula.2. The Subject Of The Order Includes: - Preparation Of Complete Design Documentation To The Extent Necessary To Complete The Order, - Development Of Technical Specifications For The Execution And Acceptance Of Construction Works, - Development Of A Traffic Organization Project For The Duration Of The Works And Target Traffic Organization - Obtaining The Necessary Decisions And Permits, - Execution Of Construction/Reconstruction Roads, - Surveying Services For Investments, - Preparation Of An Inspection Report With A Complete Set Of Required Documents, Including A Surveying Inventory.3. For The Reconstruction Of Plot No. 228 - Construction Of An Asphalt Concrete Wearing Course Overlay On A Section Of 230.00 M. Along The Road, It Is Necessary To Provide For The Development Of A Storm Ditch, Construction Of A Storm Sewage System, Construction Of A 230.00 M Long Pedestrian And Bicycle Route, Construction Of The Necessary Culverts, Storm Inlets, Inspection Wells, And Sewage Channels Made Of Pvc Pipes. The Conflicting Street Lighting Should Be Modernized And Rebuilt - Poles With Led Lighting Fixtures And Cabling, And Led Cat Eyes Lighting Points Should Be Installed Along The Entire Length. Make Technological Channels Along The Entire Length Of The Road.4. For The Reconstruction Of Plot No. 229 - Construction Of An Asphalt Concrete Wearing Course Overlay On A Section Of 700.00 M. Along The Road, The Construction Of 550 M Long Pedestrian And Bicycle Sidewalks Made Of Concrete Cubes Should Be Planned. 10 Cm, Construction Of A Road Culvert With End Walls, Construction Of The Necessary Storm Drains, Inspection Wells, Sewers Made Of Pvc Pipes, Construction Of A Storm Sewage System. The Conflicting Street Lighting Should Be Modernized And Reconstructed - Poles With Led Lighting Fixtures, And Led Cat Eyes Lighting Points Along With The Cabling Should Be Installed Along The Entire Length.4. For The Reconstruction Of Plots No. 273, 238 - Construction Of An Asphalt Concrete Wearing Course Overlay On A Section Of 630.00 M. Along The Road, It Is Necessary To Provide For The Development Of A Storm Ditch, Construction Of A Storm Sewage System, Construction Of A 480.00 M Long Pedestrian And Bicycle Route, Construction Of The Necessary Culverts, Rainwater Inlets, Inspection Wells, And Sewers Made Of Pvc Pipes. Conflicting Street Lighting Should Be Modernized And Rebuilt - Poles With Led Lighting Fixtures And Cabling. Install Technological Channels Along The Entire Length Of The Road. A Detailed Description Of The Subject Of The Order Is Included In The Pfu
|