Engineering Services – Renovation Of The Lorsch Clinic - Tga - Elt. The Clinic Plans To Reduce The Number Of Beds. Two Bed Wards Are To Be Reduced In Size And Relocated In The Building So That Part Of The Old Existing Building Can Be Dismantled. When Planning, The Increased Demands On A Hospital During Ongoing Operations, The Requirements Of Patients And The Associated Movement Flows Must Be Taken Into Account. The Areas To Be Worked On Largely Include Areas For Patient Care And More Subordinate Treatment And Care Units. Technical Systems Or Operating Theaters As Well As Intensive Care Areas Should Not Be Changed And Should Not Be Planned. In Addition To The Areas To Be Converted, The Client Plans To Outsource The Administration To A New Building. If Necessary, This Building Should Be Constructed In Modular Construction By A System Supplier. The Services Are To Be Provided In Accordance With Section 53 Ff Hoai, Part 4 Specialist Planning Section 2 Technical Equipment. The Range Of Services Should Correspond To Service Phases 1 To 8 Inclusive Of The Hoai For System Groups 4 And 5. Also As Named In The Hoai. The Complete Renovation Of The Old Building Including Reorganization Of The Areas Is To Be Planned. This Means That All Supply Media And Lines, Assignments, Etc. Must Be Checked Accordingly And Re-Planned If Necessary. In Addition, Ongoing Operations Must Be Taken Into Account During The Renovation Phase And The Construction Process Must Be Controlled Accordingly During Implementation. During Planning And Execution, The Intermediate Steps And The Individual Conditions Of The Building Throughout The Construction Phases Must Be Taken Into Account And The Partial Dismantling Must Be Planned And Supervised. A New Building Is To Be Built To Outsource The Administration. For This Purpose, The Service Phases 1 And 2 Analogous To Hoai 2021 Are Commissioned For The Services Analogous To § 53 Ff Hoai, Part 4 Specialist Planning, Section 2 Technical Equipment Of The System Groups 4. + 5. Furthermore, A Tender With A Service Program In Accordance With Section 7C Vob/A (Functional Service Description) Must Be Drawn Up. The Client Reserves The Right To Assign Orders In Stages. The Lph Levels Are Intended For The Assignment. 1-2, Lph. 3-(4), Lph. 5-7 And Lph. 8. As Part Of Funding Management, The Documentation Of Service Phase 2 Is Combined Into An Overall Concept For The Funding Provider.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 88532705
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.