Structural Shell Work – Conversion And Modernization Measures At The Sankt Ingbert Cotton Mill. Shell Construction Work Of The Constructive And Non-Constructive Renovation Measures In The Area Of The Main Building, Former Boiler House / Coal Bunker And Foyer, Essentially Consisting Of: - Masonry Walls Ks 24 Cm F90 / F90 A+M Including Door Openings, Connections Etc.: Approx. 1,675 M² - Reinforced Concrete Columns, Ring Anchors, Beams, Lintels, Etc. In Small Quantities Including Formwork, Reinforcement Etc.: Approx. 15 M³ - Door Openings Vary. Create Dimensions In Existing Walls: Approx. 30 Pieces - Wall Openings In Existing Walls Vary. Manufacture Dimensions: Approx. 170 Pieces - Wall Openings, Close Existing Walls: Approx. 205 Pieces - Core Drilling Of Various Sizes: Approx M³ Including Reinforcement Connections Existing - Creating Passage Openings / Portals In The Future Foyer Incl. Temporary Supports Etc.: 2 Pieces - Closing Ceiling Openings Existing: 2 Pieces Including Reinforcement Connections Existing - Producing New In-Situ Concrete Self-Supporting Stairs: 2 Pieces - Demolition Of Concrete Ribbed Ceiling: Approx. 5.0 M³ Demolition / Gutting Of Existing Staircase And New Construction Of Access Core With Elevator Shaft, Essentially Consisting Of: - Demolition Of Roof Structure / Roof Exit (Walls + Ceiling): Approx. 30.0 M³ - Demolition Of Interior Walls, False Ceilings, Staircases + Platforms, Former Staircase: Approx. 200.0 M³ - Excavation Of The Elevator Underpass: Approx. 30.0 M³ - New Construction Of The Foundation + Elevator Underpass Waterproof Concrete: Approx. 15.0 M³ - New Construction Reinforced Concrete Walls, Elevator Shaft: Approx. 45.0 M³ - New Construction Of Reinforced Concrete Ceilings Access Core: Approx. 45.0 M³ Shell Construction Work, Construction Of Extensions And Additions (Techn. Outbuildings, Vestibule, Staircase Extension), Essentially Consisting Of: - Excavated Earth: Approx. 270 M³ - Reinforced Concrete Strip Foundations: Approx. 26.0 M³ - In-Situ Concrete Floor Slabs: Approx. 46.0 M³ - In-Situ Concrete External And Internal Walls: Approx. 70.0 M³ - Reinforced Concrete Ceilings: Approx. 16.0 M³ - Reinforced Concrete Stairs: 1 Piece Additional Services Shell Construction, Essentially Consisting Of: - Clinker Masonry As A Facing Shell (Supplement Existing): Approx. 60.0 M² - Filling The Well Shaft Including Dewatering With Settling Basin: Approx. 35.0 M³
Contact Information
Address
Am Markt 12
Contact No.
+49 68 94 13 0
Email
info@st-ingbert.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 88526274
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.