Facilities Services Of Raumas Technical Department Is Responsible For The Tasks Related To The Role Of The Owner Of The Properties Directly Owned By The City. Facilities Services Is Asking For Your Offer For The Sewer Cleaning Of The Family Support Center. Sewer Pipes Are Described Before And After Cleaning. All Sewer Pipes Are Opened And Cleaned. Odor Locks And Toilet Seats Are Removed. Cast Iron Pipes And Possible Plastic And Copper Sewer Pipes Are Cleaned. Floor Drains Are Cleaned Of Dirt / Rust, The Old Odor Trap Cap Is Removed, And Floor Drain Inserts (Roaster / Plastic) Are Used To Repair The Drains. In The Case Of Tight Bends, The Drain Pipes Of The Sinks Can Be Connected To The Toilet Seat To Be Renewed Or, Alternatively, To The Side Branch Installed At The Base Of The Toilet Seat With A 32 Mm Side Connection. 10 Toilet Seats Will Be Renewed: Seats And Installation Work Are Part Of The Contract. Removal And Re-Installation Of Water Fixtures Are Part Of The Contract. Floors Are Protected By Protective Mats From Work Stations And Walkways Leading To Work Stations. Work Stations Protect Wall Surfaces And Nearby Furniture. The Offer Must Include That The Branch Connections Are Installed In Each Branch. The Total Price Of The Work Is Given In Full Working Condition. Final Cleaning Is Included In The Contract. All Possible Holes, Structural Openings, Toilet Seat Renewals, Sewer Inspection Hatch Openings/Additions And Renewals, Etc., I.E. All The Work Necessary For The Implementation Of The Work To Be In Full Working Order, Are Included In The Total Price. You Should Familiarize Yourself With The Site Before Leaving Questions. There Will Be Two (2) Target Displays: 12.11.2024 At 13.00 And 13.11.2024 At 13.00. You Must Register For The Target Screening No Later Than 7 November 2024 By Email: Toni.Suursoho@Rauma.Fi. It Should Be Taken Into Account That There Is Round-The-Clock Activity In The Property During The Entire Time Of The Sanding Work. The Winning Bidder Will Deliver The Work Plan To The Customer Well In Advance Of The Start Of The Contract. In The Work Plan, The Use Of The Property Must Be Taken Into Account Throughout The Work So That There Are No Unreasonably Long Interruptions To The Use Of The Drains, And The Work Must Be Planned In Such A Way That Some Of The Drains Are In Use Throughout The Work. After The Site Inspections, It Will Be Decided Whether The Contractor Will Supply Dry Toilets And A Toilet/Shower Container For The Duration Of The Contract. The Hybrid Method Is Not Allowed Unless Separately Agreed Upon Without Additional Costs. The Work Will Follow The Instructions Of Rt Card 103214 In All Respects. Work Will Start On June 2, 2025 At The Earliest. The Pipelines In The Attached Drawings Are Indicative And The Pipe Sizes Are Assumptions.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 88519736
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.