Foundation Work And Water-Well Drilling – Well Construction/Sucking Wells. In Order To Be Able To Seep Away The Groundwater/Layer Water, Three Absorption Wells With A Drilling Depth Of 14.0 M Below The Top Of The Ground And A Drilling Diameter Of 1500/1000 Mm Must Be Built. Dn 500 Must Be Provided As The Expansion Diameter. At The End Of The Wells, Well Rooms Must Be Built As Underground Shafts With A Diameter Of 2 M.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 88469002
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.