Structural Steelworks – Ve309 Stahl-Stahlwasserbau Ba 3.1. Siel Lohgraben Construction Site Equipment • Scaffolding Work (Stair Tower 1 Piece Up To Approx. 3.40 M Construction Height, Side Protection Approx. 13 M) Shut-Off Devices • 2 Gate Valves (Dn1000), Subsequently Anchored To The Wall • Covers, Column Stands, Protective Hoods • Drives Without Installed Actuator Control • Maintenance Work Before Commissioning • Various Pieces Of Equipment (Permanent Lubrication, Signage, Storage Box, Etc.) Railings, Platforms, Ladders And Equipment • Rail Railings (Hollow Profiles And Sheets, Structural Steel, Hot-Dip Galvanized, Approx. 0.61 To) • Filler Bar Railings (Hollow Profiles And Sheets, Structural Steel, Hot-Dip Galvanized, Approx. 0.13 Tons) • Stirrups (Hollow Profiles And Sheets, Structural Steel, Hot-Dip Galvanized, Approx. 0.07 Tons) • Platform Substructure (Bars, Shaped Steel, Sheets, Structural Steel, Hot-Dip Galvanized, Approx. 0.34 Tons) • Platform Gratings 30X3 Mm (Structural Steel, Hot-Dip Galvanized, Approx. 5.50 M2) • Fixed Ladders (Stainless Steel, Approx. 7.10 M Ladder Length, Including Entry Aid) • Various Pieces Of Equipment (Signs, Locks, Etc.) • Relining Work, End Supports For Inspection Closures • Guide Rails (Stainless Steel Or Aluminum, Approx. 9.30 M) • Casting Stop Beams • Stop Beams (Approx. 5.50 M²) General • Filling And Emptying The Shaft With Water To Check The Leak Rate • Pumping Out Dirty Water From The Structure • Commissioning, Commissioning • Test Construction Of Inspection Closures • Instructions On Technical Processing • Planning Services, Documentation/Inventory Planning, Ce Markings, Ce Declaration Of Conformity • Instruction Protocols Siel Street Drainage Sr12 Construction Site Equipment • Scaffolding Work (Stair Tower 1 Piece Up To Approx. 2.60 M Installation Height, Side Protection Approx. 12 M) Shut-Off Devices • 2 Shut-Off Valves (Dn500), Subsequently Anchored To The Wall • Covers, Column Stands, Protective Hoods • Drives Without Installed Actuator Control • Maintenance Work Before Commissioning • Various Equipment (Permanent Lubrication, Signage, Storage Box, Etc.) Platform, Ladder And Equipment • Platform Substructure (Bars, Shaped Steel, Sheets, Structural Steel, Hot-Dip Galvanized, Approx. 0.25 Tons) • Platform Gratings 30X3 Mm (Structural Steel, Hot-Dip Galvanized, Approx. 4.00 M2) • Fixed Ladders (Stainless Steel, Approx. 6.70 M Ladder Length). , Including Entry Aid) • Various Pieces Of Equipment (Signs, Locks, Etc.) General • Filling And Emptying Shafts With Water To Check The Leak Rate • Temporary Line Blocking • Commissioning, Commissioning • Instruction In Technical Processing • Planning Services, Documentation/Inventory Planning, Ce Markings, Ce Declaration Of Conformity • Instruction Protocol
|