Tender For Safety Measures Works Of Village Barod For Seepage Effected House Under Navnera Barrage Project- 1 Cutting & clearance of jungle,bushes,shrubs Ankra / Ipomoea, Julifloratypna etc. on canal and bund sindry/ moist/ slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. thick 2 Excavation including loading, unloading, disposal and dressing of excavated earthwithininitialleadof50mandliftupto1.5mincludingdressingof excavated area and dewatering wherever required complete in all respect 3 (a) Hard / dense soil 4 (b) Hard soil mixed with Kankar / boulders, Morrum 5 Preparation of foundation of structure including removal of all loose stones, silt and final washing. (a) By manual labour 6 ProvidingandLayinginpositionofCementconcreteNominalmix (1:3:6) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3(1 cement : 3 coarse sand) and making good the joints excludingthe cost of centering, shuttering and reinforcement. Well graded crusherbroken stone aggregate of maximum size upto 20mm 7 ProvidingandLayinginpositionofCementconcreteNominalmix (1:2:4)includingleadsofallconstructionmaterials,curing, compaction and finishing with rendering in cement sand mortar 1:3(1 cement : 3 coarse sand) and making good the joints excludingthe cost of centering, shuttering and reinforcement. Well graded crusherbroken stone aggregate of maximum size upto 20mm 8 Side shuttering including propping etc. Retaining wall, counterfort, abutment, wing walls up stream or down- stream slope facings of dams and open faces of construction joints etc. 9 Supplying of M.S. reionforcement including labour charges for bending bindingandplacinginpositionallreinforcementasperdrawing including cost of binding wire and all leads and lifts using.Tor or ribbed bars (IS :1786-1985) 10 Extra labour charges for RCC due to obstruction in laying and placing the reinforced cement concrete due to reinforcement. Columns, slabs, cantilevers projections staircases, lintels, beams, chajjas,Retainingwalls,piers,abutments,galleries,archcovers,bed plates, sluice capstan bases etc. 11 Extra lead over item no 2 of excavated material. 12 Beyond initial lead of 50 m & upto 250 m 13 Add extra over item 10 (a) for lead beyond 250m& upto 750m (for average 1/2Km). 14 Add extra for each subsequent lead of 500m or part, there of beyond ½ Km.& upto 5 Km ((5-0.5)/0.5)*8.5 15 Add extra for each subsequent lead of 1 km or part there of beyond 5 Km (Lead of 16 Km)(16-5)*8.5) 16 Compaction of earth or highly weathered strata (a) By manually or plain roller. (density 90% of Proctor) 17 Spreading of quarry rubbish / spalls / murranda to required grade & camberin layers not exceeding 15 cm. thickness (loose) as per specificationsincluding dressing etc. complete. 18 Providing, laying and fixing in position RCC spun or hume pipe with collars (ISI 458-2003) in required size packed in gasket for hume or spun yarn & neatly finished with rich grout of cement mortar 1:3 perfectly air tight including testing of joints. Dia. 19 (a) 150mm NP-3 20 (b) 1000 mm NP-3 21 180cm high fencing with angle iron post 55x55x6mm. placed at every 3Mtr. apart 45cm. in ground embedded in cement concrete 1:3:6 (30x30x60cm) corner and every tenth post to be strutted with 55x55x6mm. angle iron provided with 6 horizontal lines and two diagonals of black barbed wire between two posts fitted and fixed with G.I. staples including earth work in excavation etc. complete.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 88425838
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.