Construction Work – Elte Savaria Campus D Building Energy Renovation. The Subject Of This Procurement Is The Energetic Modernization Of The Building D Of The Savaria Campus Of Elte Szombathely. Within The Framework Of A Business Contract, The Long-Term Goal Of This Project Is To Increase Energy Efficiency And Energy Saving. According To The Technical Content Of The Design Concept, The Expected Reduction In Annual Primary Energy Consumption: 2,600,000 Kwh/Year. The Building Affected By The Investment Consists Of The Northern A And The Southern B Parts Of The Building Above Berzsenyi Dániel Tér, The Current Construction Affects The A Part (Hrsz. 6272/1/A/1-6.). The Building Is Located In The Central Part Of Szombathely, In A Local Protected Environment. Building Level: Basement+Ground Floor+4 Floors, Wall Structure: Pillar Frame, Prefabricated Parapet Elements, Masonry, Floor Structure: Reinforced Concrete, Prefabricated Hollow Panel, Door And Window Structure: Outdated Steel, Wooden Window/Door, Base Structure: Point Foundation. Summary Technical Content Of The Complex Building Energy Renovation: Replacement Of Facade Doors And Windows, Thermal Insulation Of Facade Walls On The Outside With Panels, Subsequent Thermal And Waterproofing Of The Flat Roof, Installation Of A Solar Panel System, Mechanical Modernization. This Construction Project Does Not Require A Permit, A Supporting Opinion From The Oét And A Heritage Protection Notification Are Required. 1.) Architecture: Replacement Of Windows And Doors: New Doors And Windows With Aluminum Structure, Aluminum Curtain Walls, Plastic Doors And Windows Covered With Aluminum Will Be Installed In The Case Of Non-Modern Doors And Windows. Facade Thermal Insulation: 15 Cm Thick Mineral Wool Thermal Insulation Board With Limestone Covering. Sheet Metal Coverings Will Also Be Placed On The 4Th Floor Of The Main Building Together With The Eaves. This Is Also A Wall Structure Formed With Fiber Thermal Insulation With Ventilation And The Support Structure Necessary For The Plate Covering. After The Facade Insulation, A New Vertical And Horizontal Gutter Will Be Installed. Thermal And Waterproofing Of A Flat Roof: Cleaning Of The Existing Roof Surface And Old Insulation And Steam Perforation On A Horizontal Surface. Flat Roof Layer Structure: - Existing Slab Structure - Sloped Concrete - Existing Waterproofing Perforated - Vapor Technical Pe Film - With 20 Cm Step-Resistant Thermal Insulation Material, Mechanical Fastening. - 1 Layer Of Pvc Rainwater Insulation With Mechanical Fixing, Fixing Set (4 Pcs/M2 In The Central Part) Splicing Of Roof Gutters With Anti-Clogging And Leaf Basket Type Is Required. Placement Of Bending Element With Fixing At Wall Connections And Attic. Waterproofing Of Chimney Roof Superstructures, Ventilation Pipes And Ventilation Outlets At A Height Of 25 Cm, Fixing And Sealing The Insulation With Tin Foil. The New Pvc Waterproofing Above The Performance Hall Must Be Made With Plastic Standing Screeds Applicable To The System, Which Are Placed With A Center Distance Of 60 Cm In Accordance With The Slope Formation. Noise Protection Wall: A Noise Protection Wall Is Made Around The Machinery Installed On The Roof In Accordance With The Roof Top View Plans. Interior Works: In The Rooms Affected By Wall And Floor Breaches, The Wall And Ceiling Plaster Must Be Restored And Then Painted.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 88399286
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.