Tenders Are Invited For Railway Signaling Works - Increasing Economic Efficiency And Railway Safety By Incre ... in Romania
Tender Notice
TenderID
88398234
Tender Brief
Tenders Are Invited For Railway Signaling Works - Increasing Economic Efficiency And Railway Safety By Increasing The Level Of Centralization Of Railway Signaling Installations - 8 Lots: Lot 1 - Cf Sectors: Lot 1 - Regional Branches Of Cf Bucharest And Craiova (Design And Execution)
Railway Signaling Works - Increasing Economic Efficiency And Railway Safety By Increasing The Level Of Centralization Of Railway Signaling Installations - 8 Lots: Lot 1 - Cf Sectors: Lot 1 - Regional Branches Of Cf Bucharest And Craiova (Design And Execution). The Works Will Comply With The Requirements Of The Specifications No. No. Inv.4/54/16.10.2024 And Technical Specifications A) Estimated Value Of The Contract - 499,335,025.93 Lei Consists Of: - Estimated Design Value - 19,504,405.62 Lei - Estimated Execution Value - 479,530,620.31 Lei - Estimated Value Of Advertising - 300,000.00 Lei B) Miscellaneous And Contingencies: - Estimated Value Of Contingencies - 48,614,833.81 Lei Total Value (P+E+Advertising+Contingencies)= 19,504,405.62 +479,530,620, 31 +300,000.00 +48,614,833.81 = 547,949,859.74 Lei Without Vat. The Duration Of The Contract Is 21 Calendar Months (For S1+S2), Of Which: • 6 Months From The Start Date Of The Oîp Design Period For S1+S2 As Follows: - 5 Months From The Start Date Of The Oîp: The Elaboration Of The Project Technical Pt (Pac, Poe And Pte, Including Sc Approval At Afer); (S1+S2) - 1 Month From Pt Development, Pt Approval In Cte Srcf Bucharest, Cte Srcf Craiova And Cte Cncf Cfr Sa And Obtaining The Building Permits ( Ac);(S1+S2) • 15 Months From The Start Date Of The Oîex Execution Period, In Which The Works Are Carried Out, For (S1+S2) Including The Performance Of Tests At The End And Functional And Operational Tests, And Obtaining The Certificate Of Ce Verification And The Preparation Of The Authorization File And Its Submission To The Asfr For The Terrestrial Ccs Structural Subsystem, Including The Reception At The End Of The Works (Rtl) (Works On Both Srcf) After The Completion Of The Design And Execution Of The Works, It Follows: • 60 Months From The Rtl – The Warranty Period, Including The Issuance By Asfr Of The Commissioning Authorization Of The Terrestrial Ccs Structural Subsystem, According To Gd 108/2020; • 2 Months After The End Of The Guarantee Period - Closing Period, In Which The Final Reception Is Carried Out By The Contracting Entity And The Final Work Statements Are Handed Over By The Contractor In Order To Issue The Final Payment Certificate By The Supervisor. Total Contract Implementation: 83 Months From The Start Date Notified By Oîp For S1+S2
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 88398234
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.