Request For Proposal (Rfp) For Real Time Noise Monitoring Stations Supply Installation Maintenance Of Stations Installation Commissioning Operation And Of 8 No.S Of Real Time Noise Monitoring Stations In Tamil Nadu Operation And Noise Monitoring , Noise Monitoring Terminal (Nmt) , Iec61672-1(2013) Class1: Outdoor Microphone , Nmt System With Alphanumeric Display At Monitoring Stations , P4 Outdoor Video Wall(6.31X6.31) , High Gain Gsm/Gprs Antenna (8 Db Dual Band Antenna) Or Better , Ip-65 Compliant Enclosure For Remote Stations , Transmission Unit-Gsm/Gprs Modem Or Better , Intrusion Alarm To Be Transmitted At Central Station , Power Backup , External Battery (Minimum 65Ah) Sealed Maintenance Free (24Hrs Backup) , Solar Panel For Power Backup (Minimum 75 Watts) , Solar Charge Controller (Minimum 20Amp) , External Nema 4 Enclosure , Recurring Charges , Remote Station Recurring Charges On Yearly Basis Including Sim Cost, 08 Number Of Stations Recurring Cost And Any Other Cost. , Recurring Charges On Yearly Basis For Central Server With 4Mbps Or Better Fixed Ip Connection , Remote Display, Gprs Receiving Charges On Yearly Basis (8 Nos Alphanumeric And 2 Nos. P4 Outdoor Video Wall) , Central Receiving Station , Charges For Empanelled Cloud Based Server , Analysis Software With Full Graphics Display, Communicationmanagement And Database Generation For Cloud Based Server , Web Enabled Software For Data Distribution , Data Processing Workstation , Installation And Civil Work , 4 Meters Triangular Lattice Mast And Mounting Accessories , Installation Of The Remote Stations With Civil Work , Installation Of The P4 Outdoor Video Wallwith Civil Work , Automatic Backup , 4Tb Nas Drive For Incremental Backup Of Existing And New System. , Calibrators , Handheld Stand Noise System With Transportation Kit , External Acoustic Calibrator With Microphone Adaptor , Transportation And Insurance , Transportation And Insurance Of Material To Respective Sites , Two Year Extended Warranty , Camc , Comprehensive Annual Maintenance Cost For 4Thyear , Comprehensive Annual Maintenance Cost For 5Thyear , Comprehensive Annual Maintenance Cost For 6Th Year , Comprehensive Annual Maintenance Cost For 7Th Year , Comprehensive Annual Maintenance Cost For 8Th Year
|