Miscellaneous General And Special-Purpose Machinery – Installation For Recovery And Packaging Of Radioactive Solutions. The Services Covered By The Contract Include, In A Non-Exhaustive Manner, For Sub-Assembly No. 1 “Mechanics And Processes”: The Glove Box (Bàg) Track Pu, The Process Equipment Internal And External To The Bàg, The Ventilation Of The Bàg; The Internal Bàg Piping, The Temporary And Final Control Command, The Instrumentation With The Associated Control Command, The Transfer Cart. The Following Services Are Provided As Options: Creation Of Connections To Process Pipes, Assistance With Active Tests, Creation And Installation Of A 3L Dosing Pot In The Process Instead Of A 2.3 L Dosing Pot Initially Planned , Supplies Of Spare Parts, The Supply And Installation Of A Ring On The Floor Of The Bàg With Its 500N Dynamometer. The Services To Be Carried Out For Sub-Assembly No. 2 Fitting Out The Premises Include In Particular: Civil Engineering, Finishing Work (Partitions, Walkway, Guardrail, Platform, Floor Coverings, Paints, Cf Doors, Ramp, Etc.) , Mechanical Equipment Outside The Bàg (Jib, Hoist, Lifting Table, Etc.), Service Pipes, Modification Of The Decking Where The Bàg Is Located, Modification Of The Stairs Allowing Access To The Decking, Temporary Ventilation, The Following Services Are Provided As Options: Ventilation Of Premises, High Currents, Low Currents (Other Than Linked To The Process). The Following Services Are Provided As Options: Supply Of Spare Parts, Supply Of 4 Additional Secondary Container Centralizers, Creation Of A 3D Model From The Study Phase To Validate The Design Then Updated In Tqc.
|