Mechanical Engineering Installation Works – Stage Technology - Upgrade Control, Renovation Of Revolving Stage And Curtain. In The Thalia Theater In Hamburg, The Revolving Stage, Including The Understage, The Decorative Curtain And The Bt Control Are Being Replaced. The Renovation Will Take Place During The Season Breaks From 2025 To 2028. In The Area Of The Stage And The Understage, The Renovation Of The Revolving Stage (Db) Will Be Carried Out By Upgrading The Following Components: Rollers, Centering Pins, Crane Rail, Static Upgrading Of The Steel Construction, Renewal Of Supports And Supports For Inserts, Renewal Of Slip Ring Bodies, Renewal Of The Rotary Drive, Installation Of New Podiums, Including Drive Units, Divided Into 3 Bps And 3 Nfps, New Stage Floor, 2 New Person Sinks, New Paint For All Of The Steel Of The Um. Outside The Stage Area, The Previous Control System Will Be Revised During The 2025 Season Break And The Decorative Curtain Will Have New Scissors And A New Drive. During The 2026 Season Break, Work Will Be Carried Out At The Db With The Upgrading Of The Rollers, The Centering Pin And The Crane Rail As Well As The Installation Of The New Slip Ring Body , The New Rotary Drive And The New Podium Guides And Podium Drive Units. During The 2027 Season Break, The Temporary Closure Of The Podium Opening Will Be Completely Dismantled And The New Follow-Up And Stage Podiums Will Be Installed And Tested. At The Same Time, The Stage Floor On The Revolving Stage And The Lower Stage Of The Revolving Stage Will Be Renewed And Two New Pvs Will Be Installed. Ultimately, The Final Commissioning, Including Testing And Acceptance Of All Components, Should Take Place During The 2028 Season Break. Construction On Site: July 6Th, 2025 - August 31St, 2025 The Stage Floor Must Be Kept Closed Until July 9Th, 2025. Submission Of The Workshop And Assembly Planning: April 30, 2025 Start Of Execution On Site: July 6, 2025 Completion Of Partial Commissioning: August 24, 2025 Completion Of Type Testing And Sv Acceptance: August 29, 2025 Completion Of User Instruction And Handover: August 31, 2025 // Construction Before Location: July 9Th, 2026 - August 19Th, 2026 The Stage Floor Must Be Kept Closed Until July 12Th, 2026. Start Of Execution On Site: July 9Th, 2026 Completion Of Partial Commissioning: August 12Th, 2026 Completion Of Type Testing And Sv Acceptance: August 17Th, 2026 Completion Of User Instruction And Handover: August 19Th, 2026 // Construction On Site: July 1St, 2027 - August 11Th, 2027 The Stage Floor Must Be Closed Until July 4Th, 2027. Start Of Execution On Site: July 1St, 2027 Completion Of Partial Commissioning: August 4Th, 2027 Completion Of Type Testing And Sv Acceptance: August 9Th, 2027 Completion Of User Instruction And Handover: August 11Th, 2027 // Construction On Site: July 3Rd, 2028 - August 11Th, 2028 The Stage Floor Must Be Closed Until July 6Th, 2028. Start Of Execution On Site: July 3Rd, 2028 Completion Of Commissioning: August 4Th, 2028 Completion Of Type Testing And Sv Acceptance: August 9Th, 2028 Completion Of User Instruction And Handover: August 11Th, 2028 // For The Individual Deadlines For The Years 2025 To 2028, See Also The Bvbs Form 6- 070, Paragraph 2.3.
|