Description: Construction Of A New 30,253 Sf Jail With A Capacity Of 118 Beds, Expanding To 144 Beds In The Future. The Structure Will Consist Of A Combination Of Concrete, Pre-Cast Concrete, Masonry, And Pre-Engineered Steel. The Envelope Of The Building Will Consist Primarily Of A Mixture Of Metal Panels, Tpo Roofing, And Face Brick. Site Work, Site Utilities, And Site Improvements Are A Part Of The Project.Location: Sylvester, Ga. The Project Site Is Bordered By South Washington Street To The West, West Martin Luther King Drive To The North, South Isabella Street To The East, And West Crockett Street To The South.Schedule: The Project Is Scheduled To Start Approximately Late February Or Early March Of 2025, Pending Final Receipt Of Trade Contractor Proposals, Development Of The Guaranteed Maximum Price (Gmp) Proposals, Approval Of The Gmp By The Owner, And Finalization Of All Other Requirements Of The Owner To Facilitate The Start Of Construction. A Construction Schedule Is Included In The Documents Section At The Link Below.Pre-Bid Conference: A Non-Mandatory Pre-Bid Conference Will Be Held At The Project Site On November 19, 2024, At 11:00Am Local Time.Access To Bid Documents: Contract Documents, Trade Bid Packages/Scopes Of Work, The Construction Schedule, And Other Supplemental Information Can Be Obtained Electronically By Visiting The Link Below.Manual Link - Https://App.Buildingconnected.Com/Public/59139B8bce945d0a00d2cd33
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 88343936
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.