1. The Subject Of Part I Of The Order Is The Arrangement Of Rooms In A Building Belonging To The Provincial Headquarters Of The State Fire Service For Office Purposes, Located In Lublin At Ul. Pozacka 7 - Stage I. Scope Of Works To Be Carried Out Under Stage I:• Demolition Works: - Demolition Of Parts Of Partition Walls (In Accordance With The Attached Drawing Documentation), - Knocking Out Door Openings In Structural Walls (In Accordance With The Attached Drawing Documentation), - Dismantling Of Joinery Door, Widening Existing Openings (In Accordance With The Attached Drawing Documentation), - Partial Dismantling Of Suspended Ceilings, - Cutting Off Plasters And Wall Cladding, - Cutting Off Floors, - Dismantling Bathroom And Social Room Equipment. • Brick Works: - Installation Of Lintels, - Installation Of Stair Steps .• Construction Of Partition Walls From Plasterboards (In Accordance With The Attached Drawing Documentation): - Separation Of Office Rooms No. 8-1, 8-2, - Separation Of The Corridor No. 8-6A, - Separation Of The Vestibule, Toilet And Room. Office No. 8-3, 8-4, 8-5.• Finishing Works: - Installation Of New Doors, Including Balcony Doors, - Plastering Works, Including Smoothing, - Painting Of Walls And Ceilings, - Laying Tiles On Walls And Floors, - Laying Carpets, - Installation Of Suspended Ceilings, - White Installation. • Cooling Installation Works In The Vrf System: - Disassembly Of Existing Wall-Mounted Indoor Units (Air Conditioners), - Making The Necessary Holes In Building Partitions To Carry Out The Cables Of The French, Condensate And Control Installations, - Construction Of The Substructure And Supporting Structure For The Outdoor Unit, - Installation Of Indoor Units (Air Conditioners) And External Unit (Generator), - Construction Of Freon Installation With Control System, - Construction Of Condensate Installation, - Construction Of Casing For Pipeline Risers, - Construction Of Inspection Holes In Suspended Ceilings According To The Device Manufacturers Recommendations. • Electrical And Telecommunications Installation Works:- Disassembly Of All Electrical Installations In The Renovated Part (Detailed), - Scope According To The Attached Drawing Documentation), - Implementation Of The Wlz Installation And Installation Of The Switchboard, - Installation Of 230V Sockets And Loads, - Implementation Of The 400V Power Installation, - Implementation Of The Lighting Installation, - Implementation Of The Installation Lan Structured Cabling. A Detailed Description Of The Subject Of Part I Of The Order Is Included In The Technical And Design Documentation (Dtip) - Part I Of The Order.
|