Supply And Installation Of Construction Plate With Sheet Metal Supply And Installation Of Construction Plate With Galvanized Sheet Metal And Wooden Structure. Af_03/2022_Ps, Conventional Site Location, Using A Jig Of Pointed Running Boards Every 2.00M - 2 U Conventional Site Location, 00M - 2 Uses.Af_10/2018, Manual Excavation For Crowning Block Or Footing Manual Excavation For Crowning Block Crowning Or Footing (Including Excavation For Placing Formwork). Af_06/2017, Manual Excavation For Baldrame Beam Or Running Footing Manual Excavation For Baldrame Beam Or Running Footing (Including Excavation For Placing Formwork). Af_01/2024, Mechanized Piping At The Bottom Of A Trench With Plate Soil, 5 Cm Thick. Af_08/2017, Basement Masonry With Basement Masonry Structural Block With Deconcrete Structural Block, 14X19x29cm And Compreparo Laying Mortar In Concrete Machine. Af_05/2020, Vertical Excavation For Building, With Loading, Unloading And Vertical Excavation For Building, Unloading And Transport Of 1St Category Soil, With Hydraulic Excavator (Bucket: 0.8 M³ / 111Hp), Fleet Of 9 10 M³ Dump Trucks, Dmt Of 6 Km And Average Speed 22 Km/H.Af_05/2020, Execution And Compaction Of Landfill Body (95% Execution And Compaction Of Landfill Body (95% Normal Proctor Energy) With Predominantly Clayey Soil Thick 15 Cm - Exclusive Material, Excavation, Loading And Transport. Af_09/2024, Manufacture, Assembly And Dismantling Of Formwork For Block Manufacture, Assembly And Dismantling Of Formwork For Crowning Block, In Sawn Wood, E25 Mm, 4 Uses.Af_06/2017, Assembly And Disassembly Of Formwork For Beam Manufacture, Assembly And Disassembly Of Formwork For Girder, In Resin Plywood Sheet, E17 Mm, 4 Uses Af_06/2017, Block Frame Using 10 Mm Ca-50 Steel - Assembly Using Block. 10 Mm Ca-50 Steel - Assembly.Af_01/2024, Concrete Fck 20Mpa, Trace 1:2, 7:3 (In Dry Mass Of Cement/ Concrete Fck 20Mpa, 7:3 (In Dry Mass Of Cement/Medium Sand/ Brita 1) - Mechanical Preparation With 600 L Concrete Mixer.Af_05/2021, Launching Using Buckets, Densifying And Finishing Launching Using Buckets, Densifying And Finishing Utures. Af_02/2022, Surface Waterproofing With Asphalt Emulsion, 2 Surface Waterproofing With Asphalt Emulsion, 2 Coats. Af_09/2023, Manufacture Of Formwork For Pillars And Similar Structures, In Manufacture Of Formwork For Columns And Similar Structures, E25 Mm. Af_09/2020, Assembly And Disassembly Of Rectangular Pillar Formwork Assembly And Disassembly Of Rectangular Pillar Formwork And Similar Structures, Simple Right Foot, 4 Uses. Af_09/2020, Manufacture Of Formwork For Beams, In Wood Sheet Manufacture Of Formwork For Beams, And 17 Mm. Af_09/2020, Assembly And Disassembly Of Beam Formwork, Shoring Assembly And Disassembly Of Beam Formwork, Metallic Shoring, Made Of Resin Wood Sheet, Pillar Frame Or Beam Of Conventional Structure Pillar Frame Or Beam Of Conventional Structure Reinforced Concrete Using 6.3Mm Ca-50 Steel - Assembly. Af_06/2022, Unidirectional Precast Slab, Bi-Supported, For Floor, Ceramic Filling, Conventional Joist, Total Slab Height (Filled
|