Engineering Design Services – Fraunhofer Int Euskirchen - 70-00281-2290-D Technical Equipment Hlsk Ag 1-2-3-8. The Fraunhofer Society Is Planning To Convert Individual Existing Areas Into Physical Laboratory Areas At The Fraunhofer Institute For Natural Science And Technology Trend Analyzes Int In Euskirchen. The Flood Event In North Rhine-Westphalia On July 15, 2021 Caused Severe Damage To Fraunhofer Int. The “Conversion Of The Laboratory Complex” Project Aims To Create And Secure The First Essential Laboratory Space For Operations By Converting The Ground Floor In The New Office Building (E+1) And Library Area. During The Measure, The Existing Administrative Areas (Supporting Structure/Building Shell Intact) That Were Gutted As Part Of The Flood Relief Effort Are To Be Converted Into Physical Measuring Rooms And Laboratories With An Nf Of Approximately 530 M², As Well As An Approximately 65 M² Radiation Protection Area (Isotope Laboratory) - During Ongoing Operations . Existing Building Built Around 2011, Bored Pile Or Shallow Foundation, Reinforced Concrete Frame Construction (Bkt) With Floor-To-Ceiling Post-And-Beam Façade, Clear Room Height Approx. 3.0 M. The Property Is Located In The Municipality Of Euskirchen, Parcel 165, Hallway No. 28, Euskirchen District, Appelsgarten 2. As A Military Property, The Institute Is Subject To Permanent Security And Access Control. Contract: Implementation Of Construction Planning Services By Technical Equipment Hlsk Ag 1-2-3-8 For The Fraunhofer Int Euskirchen - Ba 1 - Conversion Of The Laboratory Complex, Total Costs Kg 200-700 (Excluding Initial Equipment) Max. 5,000,000 Net (Excluding Vat) In Accordance With Ii .2.4). The Project Is Implemented Using The Zbau Process, Including The Creation Of An Application And Construction Document As Well As A Concept Discussion With The Donors. Contract: Fixed Price Contract! Fee According To Hoai According To The Rbbau Model Contracts. Gradual Commissioning Of Service Phases 2-4 And 5-8 Hoai In Accordance With The Rbbau Model Contracts. Order Lph 5-8 At The Earliest Upon Receipt Of The Approved Application And Construction Documents. Fee Zone (§56 Hoai): Iii, Fee Rate (§56 Hoai): Basic Fee Rate Amount Of Additional Costs: According To Rift-Bund In The Latest Version The Conversion Surcharge Is (%): None The Building Structure To Be Processed Will Be Remunerated As Follows: No Building Structure To Be Processed
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 88264821
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.