Taps, Cocks, Valves And Similar Appliances – Euh2 -7” Packer And Trssv Purchase. Delivery Contract With Magyar Földgáztáróló Zrt. For The Purchase Of A 7 Packer And Trssv For The Well Work To Be Carried Out During The Euh2stars Project, Together With The Related Service Services. Information About The Project: Within The Framework Of The Eu-Supported Reference Project Number 101137798 Named European Underground H2 Storage Reference System (Hereinafter: Euh2stars), The Consortium Leader Rag Austria Ag With The Partners , Among Others Together With Magyar Földgáztórő Zrt., Will Jointly Investigate And To Plan The Measures Necessary For The Rapid Recovery Of The Hydrogen Economy Along The Entire Value Chain. Within The Framework Of The Euh2stars Project, The Hydrogen Produced And Stored By The Existing Hydrogen Technology Will Be Injected Into The Komlós B-2 Plant Via The Psz-36 Gas Well (Ch Well). The Purpose Of The Project Is For The Bidder To Gain Practical Experience Of The Underground Storage And Production Process Of Hydrogen, The Operation Of The Well Structure And Surface Technology Through The Injection Of 2 X 100,000 Nm3 Of Pure Hydrogen Over Two Storage Cycles, And Then The Withdrawal Of 500,000 Nm3 Of Natural Gas-Hydrogen Gas Mixture Per Cycle. During The Implementation Of The Project, The Well Structure Of The Psz-36 Gas Well (Ch Well) Will Be Transformed, Because Based On The Tests Carried Out In Advance, This Well (Ch Well) In The Storage With A Capacity Of 30 Mm3 Is The Most Suitable For Carrying Out The Operation From The Point Of View Of Geology, Structure And Well Integrity. The Current Well Structure Will Be Partially Preserved, As The Sand Filter Will Not Be Replaced, As Operational Experience Does Not Justify This (There Was No Sand Production). Design Parameters • Pressure Range 85-120 Barg • Design Temperature: 0...+88 °C • Gas Quantities O Storage Capacity (100 Mol% Hydrogen) 200-800 Nm3/H O Extraction Capacity (Expected 20 Mol% Hydrogen + 80 Mol% Natural Gas) 400-1000 M3/H • Production Of Stratified Water 30-1000 Liters/Hour Present Technical Content Annex 1 Is The Analysis Of The Composition Of The Gas Extracted From The Well, Annex 2 Is The Laboratory Analysis Of The Produced Water. The Fittings To Be Installed Must Comply With All The Operating Conditions Specified Above, And Safe Operation Must Be Maintained. The Technical Specification Of The Well Construction Materials Is As Follows: 1.7” Packer A, Hydraulically Planted, Recoverable-Producing Packer Installation, Planting: Packer Without Sealing Element (Can Be Planted With One Installation) Connected To The Production Pipe Of The Final Assembly (Planting The Packer Together With The Final Assembly) Hydraulic Planting Equipped With A Mechanism, Planting By Increasing The Pressure Of The Production Pipe (Without Turning Or Moving The Production Pipe). Construction: Design That Can Be Removed By Pulling (The Packer Can Be Removed For Pulling The Production Pipe In The Well By Shearing The Studs, Which Can Then Be Installed) • Liner Pipe Size: 7” 32# • Packer Size: Max. Outer Diameter: 5.93 (150.62 Mm), Min. Inner Diameter: 2.897” (73.58 Mm) • Packer Lower Connection Type: 3 ½” 9.2# Vam21 Male • Packer Upper Connection Type: 3 ½” 9.2# Vam21 Female • Material: 41Xx Lo
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 88261110
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.