Woodwork – Elemental Wooden Walls, Wood-Aluminum Windows, Cross-Laminated Timber Ceiling. General Description Of The Construction Process The Schleswig-Flensburg District Is The Client For A Three-Story Administration Building With An Underground Car Park At Wassermühlenstrasse 43 In Kappeln. Floor Area: 2,053 M² Net Room Area (Nrf): 2,637 M² Floor Area (Grf): 668 M² Underground Parking Area: 1,136 M² The Property Is Accessed Via A Dead-End Road From Wassermühlenstrasse. The Dead-End Road Will Be Completed In Autumn 2024. A Construction Site Access Road Will Therefore Be Created On The Northern Edge Of The Property During The Construction Period. With The Necessary Slope Angles Of The Excavation Pit And The Area Of The Underground Car Park, It Will Become Necessary. Build The Underground Car Park In Two Construction Phases And, If Necessary, Place The Crane In The Elevator Shaft. Construction: The Building Is Constructed As A Reinforced Concrete Frame Structure. Strip Foundations, Reinforced Concrete Outer Walls Of The Underground Car Park And The Cantilevered Reinforced Concrete Ceiling Are Made Of In-Situ Concrete. The Underground Car Park Will Be Paved. The Concrete Quality Requires Execution As An Ü2 Construction Site. The Rising Floors On The Ground Floor And First Floor Are Made With Prefabricated Reinforced Concrete Parts, Steel System Beams And Prestressed Concrete Hollow-Plank Ceilings. The Outer Walls Are Non-Load-Bearing And Are Made From Timber Frame Construction - Prefabricated Walls. The Staggered Floor And The Roof Ceiling Are Therefore Built As A Wooden Structure. The Soil Conditions Require Surface Drainage During The Construction Phase And Long-Term Operation.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 88206068
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.