Construction Work – Energetic Renovation Of The Konradin Primary School And Expansion Of 4 Classrooms, Barbarossastraße 29 - 31, 87600 Kaufbeuren. Construction Site Equipment, Temporarily Close Windows/Door Openings Approx. 125 M², Building Protection Walls Approx. 215 M², Roof: O Lightning Rod Approx. 300 M, O Gravel Fill Approx. 1100 M², O Pond Liner And Foam Approx. 1100 M², O Roof Sealing, Bitumen On Wooden Formwork Approx. 1100 M², O Roof Sealing, Bitumen On Wall Area Approx. 655 M, O Roof Formwork Approx. 640 M², O Wooden Roof Truss Approx. 640 M², O Wood Wool Lightweight Building Board Approx. 100 M, O Styrofoam Insulation Approx. 100 M² , O Bituminous Casting Compound Approx. 460 M², O Pah-Containing Bitucork Insulation Approx. 460 M², O Ventilation Tower 1 Piece, O Milling With Concrete Milling Machine, Roof Area Approx. 460 M², O Milling With Concrete Milling Machine, Wall Area Approx. 255 M, O Extension Element Of Roof Drains Approx. 50 Pcs., O Disposal Of Gravel Approx. 150 Tons, O Disposal Of Bitumen Sheets Containing Pah Approx. 225 Tons, O Profile Glass Facade Approx. 45 M², O Post-Transom Facade Approx. 70 M², O External Window Made Of Wood, Approx . 0.75*2.00 M 4 Pieces, Approx. 1.80*2.20 /2.24 M 16 Pieces, O External Window Wood-Aluminium, Approx. 0.76*0.76 M 4 Pcs., Approx. 0.76*2.76 M 2 Pcs., Approx. 076*2.99 M 2 Pcs., Approx. 2.88*0.79 M 2 Pcs., O Exterior Window Metal, Approx. 0.80*0.60 M 3 Pieces, O External Window Plastic, Approx. 0.80*0.60 M 1 Piece, O Inside Window Sill, Natural Stone Approx. 21 Pieces, Facade Cladding - Aluminum Profiles Approx. 0.95*2.24 M 16 Pieces, Interior Steel Railing Approx. 13.00 M, Basement Light Shaft Reinforced Concrete 4 Pieces, Steel Mesh Fence Approx. 5.00 M, Loudspeaker 1 Piece, Ventilation Grille 1 Piece, Stainless Steel Chimney 1 Piece, Signage Approx. 5 Pieces, Pu Insulation Approx. 34.00 M, Xps Insulation Approx. 40.00 M, Reinforced Concrete Lintel Approx. 7.00 M, Internal Wall Masonry Approx. 1.30 M³, Exterior Wall Masonry Approx. 2.50 M³, Wall Openings Approx. 10 Pieces, Reveal Plaster Approx. 45.00 M, Core Drillings In Reinforced Concrete 151-350 Mm Approx. 10 Pieces, Concrete Cutting Work 8 – 27 Cm Approx. 300 M, Removal Of Pollutants: O Construction Site Equipment, O Kmf - Old Artificial Mineral Fiber Insulation, Roof Approx. 640 M², Facade Approx. 230 M², Window Joints Approx. 150 M, O Joint Sealing Compound Containing Pcbs, Expansion Approx. 142.00 M, Disposal Approx. 900 Kg, Milling Work On Concrete Supports/Walls Vertically Approx. 15.00 M, Flex Cutting Approx. 50.00 M, Concrete Cutting Work Approx. 325 M, O Fiber Cement Panels Containing Asbestos Approx. 229 M², Directing Services Approx. 100 Hours.
|