Construction Work – Energetic Renovation Of The Konradin Primary School And Expansion Of 4 Classrooms, Barbarossastraße 29 - 31, 87600 Kaufbeuren. Construction Site Equipment, Crane Stand Area, Height Control Points And Batter Board, Sanitary Washing Container, Protective Measures Foil/Furnishings Approx. 185 M², Protective Measures Floors Approx. 85 M², Construction Water, Construction Electricity, Construction Board, Assembly Of Lightweight Shaft 1 Piece, Ground Pipe Connections For Dirty Water 3 Pieces, Dismantling Of Dirty Water Shaft 1 Piece ., Dismantling Seepage Shaft 1 Piece, Construction Of Wastewater Collection Shaft (Including Excavation) 1 Piece, Pipe Trench Approx. 75 M, Underground Pipe (Dirty Water And Rainwater) Approx. 61 M, Masonry Cutting Up To 40 Cm Approx. 15 M, Core Drilling Masonry 55 -200Mm Approx. 16 Pieces, Install Steel Lintel 4 Pieces, Close Wall Opening Approx. 22 M², Plaster Repairs Approx. 50 M², Remove Topsoil Approx. 50 M², Excavation Of Construction Pit Approx. 60 M³, Excavation Of Individual, Strip Foundations Approx. 88 M³, Frost Protection Gravel And Work Rooms Fill Approx. 70M³, Sorting And Disposing Of Excavation Approx. 160 Tonnes, Concrete Work On The Floor Slab Approx. 195 M², Wall Upstand Approx. 37 M, Reinforcement Approx. 8.5 Tonnes, Perimeter Insulation Approx. 220 M², Edge Insulation/Base Insulation Approx. 38 M², Base Sealing Approx. 38 M², Closing Ceiling Opening Approx. 2M², Closing Cracks With Precast Concrete Wedge Approx. 25 M, Directing Hours 55 Hours.
|