Lot 1 - Physical Survey Of Existing Buildings, Including Equipment, Travel And Operating Costs, Lot 1 - Topographic Survey, Including Equipment, Lot 1 - Surveying Service, Lot 1 - Percolation Test For Sizing Drain, Infiltration Trench And Similar, Travel And Operational Costs, Lot 1 - Eiv - Neighborhood Impact Study, 11/05/2024, Lot 1 - Eia - Environmental Impact Study, Lot 1 - Project Management And Compatibility, Lot 1 - Inspection Reports, Including Travel And Operational Costs, Lot 1 - Architectural Project For Renovation And/Or Expansion Of Existing Building, Including Descriptive Memorial. Delivery In 3 Stages (Preliminary Project, Basic Project And Executive Project), Lot 1 - Architectural Project For New Building, Including Descriptive Memorial. Delivery In 3 Stages (Preliminary Project, Basic Project And Executive Project), Lot 1 - Urbanization Project (Patios/Parking Lots/Access Roads), Lot 1 - Landscaping Project, Including Descriptive Memorial. Delivery In 3 Stages (Preliminary Project, Lot 1 - Foundations Project, Lot 1 - Reinforced Concrete Structures Project, Lot 1 - Metallic Structures Project, Lot 1 - Wooden Structures Project, Lot 1 - Electrical Installations Project, Lot 1 - Public Lighting Project, Lot 1 - Energy Substations Project, Lot 1 - Logical Network Project (Structured Cabling) Telephony, Logic, Visual Monitoring, Sound, Alarm, Including Descriptive Memorandum. Atmospheric Discharge Protection Systems (Spda) And Grounding Project, Lot 1 - Drinking Water Hydraulic Installations Project, Lot 1 - Rainwater Reuse Hydraulic Installations Project, Lot 1 - Sanitary Sewage Collection And Treatment Facilities Project, Including Descriptive Memorial. Delivery In 3 Stages (Preliminary Project, Basic Project And Executive Project), Lot 1 - Sewage Treatment System Project (Compact Station) Including Descriptive Memorial. Delivery In 3 Stages (Preliminary Project, Lot 1 - Lpg Gas Installations Project, Lot 1 - Project Medical Gas Installations, Lot 1 - Radioprotection Project, Lot 1 - Simple Air Conditioning Project. Delivery In 3 Stages (Preliminary Project, Lot 1 - Exhaust, Ventilation And Radioprotection Project, Lot 1 - Earthworks Project, Lot 1 - Storm Drainage Project, Lot 1 - Fire Prevention Project, Lot 1 - Budget And Physical-Financial Schedule, Lot 1 - Monitoring The Approval Of Projects At Concessionaires, Fire Departments And Anvisa
|