Work Detail
Construction Work For University Buildings – University Of Regensburg - New Construction Of A Cito Research Building. Civil Engineering Work Storage Channel: Approx. 870M3 Pipe Trench Excavation Up To 5.0 M Depth Approx. 3 Pieces Inspection Shafts Dn 1500 Approx. 1 Piece Throttle Shaft Dn 1500 Approx. 82M Reinforced Concrete Pipeline Dn 1000 Approx M Depth Approx. 330M Dismantling Pvc Pipes Approx. 3 Pieces Demolition Determined. Inspection Shafts Dn 1000 Hlsk: Approx. 1,450M3 Pipe Trench Excavation Supply Lines Approx. 1,150M Pipeline Dismantling Dn 40 - Dn 65 Approx. 510M Dismantling Double Pipeline Dn 80/125 Approx. 270M Air Conditioning Cold Water Pipe Steel Approx. 135M Gas Pipe Dn/Od63 Approx. 135M Drinking Water Pipe Dn/ Od50 Approx. 135M Compressed Air Line Dn/Od32 Approx. 5 Pieces Core Drilling Reinforced Concrete Wall Electrical Work: Approx. 910 M3 Cable Trench Excavation Cables/Empty Pipes Approx 52 Pieces Of Media Feedthroughs Approx. 1700Cm Core Drillings In Reinforced Concrete Wall
Contact Information
Address
Bajuwarenstraße 2d
Contact No.
+49 941 69856 - 01
Email
vergabe@stbar.bayern.de
Other Detail
View Original Notice/Document
Download
FileName
Download
https://www.biddetail.co.in/GlobalTenderDocuments/112024/6/c5046e6b-f631-4fc9-bf86-304372bb4493/c5046e6b-f631-4fc9-bf86-304372bb4493/html
View Notice Now...
Fill Detail for Getting Instant Access
Instant Access