Supply And Installation Of Construction Plate With Galvanized Sheet And Wooden Structure. Af_03/2022_Ps, Siding With Metallic Tile. Af_03/2024, Electrical Power Input, Overhead, Three-Phase, With Recessed Box, 10 Mm2 Cable And 50A Circuit Breaker (Concrete Post Not Included). Af_07/2020_Ps, Temporary Water And Sewage Connection, Conventional Construction Location, Using Jig Of Pointed Running Boards Every 2.00M - 2 Uses. Af_03/2024, 05/11/2024, Rental Of Container 2, 30 Internal And Without Toilet (Does Not Include Mobilization/Demobilization, For Sanitary, With 4 Basins, 8 Showers, 1 Washbasin And 1 Urinal (Does Not Include Mobilization/Demobilization, Local Administration Type 2, Mechanized Cleaning Of Vegetation Layer, Vegetation And Small Trees (Diameter Trunk Less Than 0.20 M), With Crawler Tractor. Af_03/2024, Mechanized Trench Backfill With Hydraulic Excavator (Bucket Capacity: 0.8 M³ / Power: 111 Hp), Width Up To 2.5 M, Depth From 1.5 To 3.0 M, With Clay-Sandy Soil. Af_08/2023, Manual Excavation For A Crown Block Or Footing (Including Excavation For Placing Formwork. Af_01/2024, Preparation Of The Bottom Of A Trench With A Greater Width Or Width). Equal To 1.5 M And Less Than 2.5 M (Natural Soil Adjustment Af_08/2020, Mechanized Trench Backfilling With Backhoe Loader (Retros Capacity: 0.26 M³/Power: 88Hp), Width 0.8 A 1.5M, Depth 1.5 A3, With 1St Category Soil (Without Replacement) And Percussion Waste Compactor. Af_08/2023, Mechanized Trench Backfilling With Backhoe Loader (Retro Bucket Capacity: 0.26 M³/Power: 88 Hp), With 1St Category Soil (Without Replacement) And Percussion Soil Compactor. Af_08/2023, Manual Excavation For Ousapata Crowning Block (Including Excavation For Placing Formwork). Af_01/2024, Slim Concrete Ballast, Applied To Crowning Blocks Or Footings, 5 Cm Thick. Af_01/2024, Manufacture, Assembly And Disassembly Of Formwork For Crowning Block, In Sawn Wood, E=25 Mm, 4 Uses. Af_01/2024, Insulated Shoe Frame, Baldrame Beam And Running Shoe Using 6.3 Mm Ca-50 Steel - Assembly. Af_01/2024, Baldrame Beam And Running Shoe Using 8 Mm Ca-50 Steel - Assembly. Af_01/2024, Baldrame Beam And Running Shoe Using 10 Mm Ca-50 Steel - Assembly. Af_01/2024, Block Frame, Insulated Footing, Baldrame Beam And Running Footing Using 12.5 Mm Ca-50 Steel - Assembly. Af_01/2024, Framing Of Miscellaneous Reinforced Concrete Structures, Except Beams, Pillars, Slabs And Foundations, Using 5.0 Mm Ca-60 Steel - Assembly. Af_06/2022, Concreting Footing, Fck 30 Mpa, Using Pump - Laying, Densifying And Finishing. Af_01/2024, Applied To Crowning Blocks Or Footings. Af_01/2024, Block Frame Using Ca-60 Steel, Concreting Of Crowning Block Or Baldrame Beam, Mechanically Excavated Pile, Without Stabilizing Fluid, 25Cm In Diameter, Concrete Placed By Concrete Mixer Truck (Exclusive Mobilization And Demobilization).Af_01/2020_Pa , Mechanical Leveling Of Reinforced Concrete Pile, Diameters Of Up To 40 Cm. Af_05/2021, In Plywood Sheet, Block Frame Using 10 Mm Ca-50 Steel - Assembly. Af_01/2024, Block Frame And Shoe Using 25 Mm Ca-50 Steel - Assembly. Af_01/2024, Block Frame Using 5 Mm Ca-60 Steel - Assembly. Af_01/2024, Concre
|